ASSA ABLOY

ASSA ABLOY issue response to MHCLG’S Implementation Plan

  • 3 Apr 2019

A new whitepaper is available from ASSA ABLOY Opening Solutions, issued in light of the MHCLG’s Building a Safer Future: An Implementation Plan.

The whitepaper highlights the critical points from the Implementation Plan – it can be downloaded via clicking here.

An Independent Review of Building Regulations and Fire Safety, published in the wake of the Grenfell Tower fire and led by Dame Judith Hackitt, called for the development of an ‘implementation plan that will provide a coherent approach to delivering the recommendations in her Review.’

Building a Safer Future: An Implementation Plan is the response from the Ministry of Housing, Communities and Local Government.

ASSA ABLOY

The plan sets out how Government and industry will achieve the systematic overhaul required to improve building and fire safety.

Many of the key points and areas of action covered in the Implementation Plan were also highlighted in ASSA ABLOY Opening Solutions’ initial response to the Hackitt Review, which can be viewed here.

Speaking on the proposals put forward and the latest whitepaper, Brian Sofley, MD at ASSA ABLOY Opening Solutions, Door Group, commented: “We are pleased that the latest plan is in line with many of the recommendations we supported on how the industry can tackle the important issue of fire safety.

“The plan sets a statement of intent from the Government for construction and manufacturing industries. Its comprehensive approach to fire safety products will ensure that, through third-party certification, standards and safety requirements are integral, not just at the manufacturing stage, but during installation, inspection and ongoing maintenance.

“Our latest whitepaper demonstrates the alignment between Government and the construction and manufacturing industries in the approach to ensuring a safer built environment for all.”

The latest whitepapers, along with product and service information from ASSA ABLOY Opening Solutions can be found here.

ASSA ABLOY,
School Street,
Willenhall,
West Midlands,
WV13 3PW
United Kingdom

Tel: +44 (0)845 071 0882

Visit ASSA ABLOY's website

Leave a Reply

Latest news

Acoustic panelling from Troldtekt creates striking effect at 6 Embassy Gardens

Wood wool acoustic panelling with a black finish from Troldtekt has been specified throughout 6 Embassy Gardens at Nine Elms in London

Posted in Acoustics, Noise & Vibration Control, Articles, Ceilings, Posts

Passenger lifts from Stannah elevate safety and accessibility at Elizabeth Tower

Two lifts, designed and manufactured in the UK by Stannah now take pride of place as part of London’s Elizabeth Tower restoration project

Posted in Articles, Lifts, Posts, Restoration & Refurbishment, Retrofit & Renovation

Senior Architectural Systems appoints new major projects manager

Aluminium windows, doors and curtain wall solutions manufacturer, Senior Architectural Systems has appointed Mark Rossouw to the newly created role of major projects manager

Posted in Articles, Building Industry News, Doors, Posts, Recruitment, Windows

Aluminium architectural louvre products from Kingfisher now available on NBS Source

Kingfisher Louvres has made four of its most popular screening and single bank weather louvres available to specify via the NBS Source platform

Posted in Air Conditioning, Articles, Facades, Heating, Ventilation and Air Conditioning - HVAC, Posts, Ventilation