ASSA ABLOY has added another layer of security to the CLIQ ® Connect programmable key access control solution with PIN validation.
Thanks to this addition, when issuing or amending key access rights, in a couple of clicks, administrators can now set a PIN which key-holders must enter to update their key. Without entering the PIN, users will not be able to revalidate or update their key to open a new lock, therefore boosting security against unauthorised access.
The CLIQ ® Connect app pairs a user’s programmable key, via an encrypted cloud connection, with the CLIQ ® Web Manager. To change a key-holder’s access rights, a security manager accesses their CLIQ ® software and updates it. A key-holder makes a secure Bluetooth connection between their CLIQ ® Connect key and the app to instantly update access permissions or revalidate.
“CLIQ ® Connect combines convenience and high security,” explains Stephan Schulz, CLIQ Product Manager at ASSA ABLOY EMEA. “A key-holder no longer revalidates their key or updates its access rights in person by returning to base or finding the nearest programming device. All they need is a smartphone, the CLIQ ® Connect app and a secure Bluetooth connection. And now, with the option for administrators to PIN protect any key permissions update or revalidation, it’s even more secure.”
CLIQ ® Connect’s secure solution for mobile access management has been recognized several times by industry awards. CLIQ ® Connect was a winner at the Detektor International Awards, recognizing outstanding innovation in security alarms, access control and CCTV; won the Gold Trophy at France’s APS Awards; and was awarded Protector & Wik’s Golden Protector 2018 for access control.
“CLIQ ® Connect is simple and agile for even the largest organisation. It saves you time. And because your mobile workers drive fewer miles collecting and returning physical keys, it’s also a more sustainable access control solution,” Stephan concludes.
ASSA ABLOY,
School Street,
Willenhall,
West Midlands,
WV13 3PW
United Kingdom
Tel: +44 (0)845 071 0882
Wood wool acoustic panelling with a black finish from Troldtekt has been specified throughout 6 Embassy Gardens at Nine Elms in London
Posted in Acoustics, Noise & Vibration Control, Articles, Ceilings, PostsTwo lifts, designed and manufactured in the UK by Stannah now take pride of place as part of London’s Elizabeth Tower restoration project
Posted in Articles, Lifts, Posts, Restoration & Refurbishment, Retrofit & RenovationAluminium windows, doors and curtain wall solutions manufacturer, Senior Architectural Systems has appointed Mark Rossouw to the newly created role of major projects manager
Posted in Articles, Building Industry News, Doors, Posts, Recruitment, WindowsKingfisher Louvres has made four of its most popular screening and single bank weather louvres available to specify via the NBS Source platform
Posted in Air Conditioning, Articles, Facades, Heating, Ventilation and Air Conditioning - HVAC, Posts, Ventilation