Washroom Washroom

All wrapped up with Washroom Washroom: packaged contractor solutions from WeIntegr8

  • 3 Oct 2019

Leading washroom and joinery manufacturers, Washroom Washroom and Cre8 Joinery Solutions, are proudly launching WeIntegr8 – a brand-new division specialising in packaged contractor solutions.

WeIntegr8 will offer contractors a full turnkey fit-out service ideally suited to commercial, residential, leisure or education projects, making it the perfect solution for washroom schemes, reception areas, large-scale apartment fit-outs and more.

By bringing together the wealth of expertise of both Washroom and Cre8, combined with additional services including drylining, tiling, architectural metalwork, doorsets, flooring and decorating as well as integrated mechanical and electrical works, WeIntegr8 has been created to provide a full package of services from design to installation to provide contractors with a single point of contact on each project undertaken.

Specialising in the off-site manufacture of washrooms and joinery at its extensive 7,500 square foot manufacturing facility in Essex, WeIntegr8 aims to reduce the number of trades required on site for increased efficiency, hitting tight deadlines with ease.

Having access to Washroom and Cre8’s own state-of-the-art manufacturing facility and skilled team of designers, craftsmen and installers, WeIntegr8 has ultimate control over quality to make sure contractors have complete peace of mind.

WeIntegr8’s dedicated management team, led by Brendan O’Riordan as division director, will work closely with architects and clients to oversee each interior fit-out project from detail design stage to manufacture and completion, drawing on Washroom and Cre8’s established in-house design team to develop ideas.

Brendan O’Riordan, WeIntegr8 director, commented: “Launching WeIntegr8 presents an exciting new chapter for Washroom and Cre8 after nearly two decades of delivering high quality bespoke projects for some of London’s most iconic buildings.

“Joining forces to maximise their combined expertise will allow architects and clients to take advantage of our in-house design and manufacturing capabilities. 

“WeIntegr8 aims to simplify the supply chain for contractors by providing a single point of contact and therefore reducing interface management on site to ensure projects run smoothly and efficiently from start to finish.

“WeIntegr8 will offer all the bespoke design elements, attention to detail and level of service you’d expect from a Washroom/Cre8 project – our ethos is to provide a high quality finish delivered with exceptional service every time.”

Contact:

Washroom Washroom Ltd.
Units 1-10 Hill Farm
Epping Lane
Abridge
Essex RM4 1TU

Phone: 0800 999 8888

Email: [email protected]

Visit the Washroom Washroom website

Leave a Reply

Latest news

BMBI
GEZE
Encon
SWA

SWA: A focus on Steel Window Association member West Leigh

Located in Charlton, South London, SWA member West Leigh was established during the Blitz, in 1943. During the destruction in London, the company helped in repairing windows and facades that had been damaged by bombings throughout the city.

Posted in Articles, Building Associations & Institutes, Building Industry News, Building Products & Structures, Building Services, Building Systems, Case Studies, Facades, Glass, Glazing, Restoration & Refurbishment, Retrofit & Renovation, Steel and Structural Frames, Walls, Windows