Vortice

Vortice UK sales team starts the year in Italy

  • 5 Feb 2020

The VORTICE UK sales team began January with a visit to the company’s Italian headquarters, where they previewed some of the brand’s exciting new product development plans, with the environment being a key consideration. 

2020 begins with the roll-out of the Vort Avel HR450D Passive House accredited ventilation system, which was launched at the end of last year. 

Kevin Hippey, General Manager, commented: “The core business ethos in Italy is replicated in the UK, the desire to provide excellent indoor air quality to the domestic, commercial and industrial markets and our drive to ensure that all our products are as energy efficient as possible. 

“All of these measures help contribute to the reduction of carbon emissions and assist the government in achieving zero carbon by 2050.”

The Technical team at VORTICE will always be happy to work with architects, specifiers, developers and contractors in order to ensure that optimum energy efficiency and good indoor air quality is planned in at an early at the design stage of a project.

Contact:

Vortice,
Beeches House,
Eastern Avenue,
Burton on Trent,
Staffordshire,
DE13 0BB,
United Kindom
 
Phone: 01283 492949
Fax: 01283 544121

Visit Vortice's website

Leave a Reply

Latest news

BMBI
GEZE
Encon
SWA

SWA: A focus on Steel Window Association member West Leigh

Located in Charlton, South London, SWA member West Leigh was established during the Blitz, in 1943. During the destruction in London, the company helped in repairing windows and facades that had been damaged by bombings throughout the city.

Posted in Articles, Building Associations & Institutes, Building Industry News, Building Products & Structures, Building Services, Building Systems, Case Studies, Facades, Glass, Glazing, Restoration & Refurbishment, Retrofit & Renovation, Steel and Structural Frames, Walls, Windows