CE backed waterproof wet room solution for London Square apartments

London Square Bermondsey Village development

Working closely with the developer, wedi helped overcome installation challenges on-site, to co-ordinate the shower flow rates and offer drainage solutions to engineer a floor level wet room system perfectly suited for the project.

Fundo Plano system

Fundo Plano system provided an ideal solution for the floor build up from the concrete slab.

  • wedi 65mm thick
  • fully integrated trap

The tray thickness fitted alongside wedi building boards ensured that the requirement of a floor level shower was still achieved. 

Assured performance for developer and contractor

wedi Applications Engineer provided on-site training to ensure that the different trades fully understood how the wet room system was installed, resulting in a comprehensive CE backed waterproof system designed specifically to the site requirements.