Schlanduuml;ter-Systems recently hosted an interactive training workshop for 30 tiling professionals at Wembely Stadium.
Organised to enhance the knowledge of tilers, the workshop saw professionals from across London and the South of England attempt to assemble an entire wetroom and underfloor heating area.
By using products from Schlanduuml;ter’s range – such as its underfloor heating system DITRA-HEAT-E, its linear drain channel system KERDI-LINE and its KERDI-SHOWER, as well as KERDI-BOARD, its universal substrate preparation board – the event was also used to familiarise existing and potential customers with its new and updated products.
After an introduction, Schlanduuml;ter’s Technical and Training Services team delivered a live demonstration of the wetroom and underfloor heating’s installation before the attendees were encouraged to do the same.
Schluter-Systems
Units 3-5 Bardon 22
Beveridge Lane
Coalville
Leicestershire
LE67 1TE
UK
01530 813396
Visit the Schluter-Systems website
Alex Tremlett, Insight Data’s Commercial Director, discusses the challenges for construction firms in 2025 and shares six strategies for success…
Posted in Articles, Building Industry News, Building Services, Information Technology, news, Research & Materials TestingIncoming governments, especially those with significant mandates, inevitably come into power on a tidal wave of optimism coupled with hope that ‘Things can only get better’. Andrew Scott, MD of construction-focused, full-service agency Purplex, talks…
Posted in Articles, Building Industry News, Building Services, Information Technology, news, Posts, Research & Materials TestingPop Up Power Supplies has installed 13 new electricity units at The Hepworth Wakefield – read more in this article…
Posted in Articles, Building Industry News, Building Products & Structures, Building Services, Case Studies, Civil Engineering, Facility Management & Building Services, Garden, Hard Landscaping & Walkways, Landscaping, Posts, Restoration & Refurbishment, Retrofit & RenovationUK-based OPT Services has unveiled SlimLine™ Capping, a groundbreaking fibre cable protection solution that promises to deliver significant environmental and installation advantages to the fibre optic industry.
Posted in Articles, Building Industry News, Building Products & Structures, Building Services, Facility Management & Building Services, Information Technology, Innovations & New Products, Sustainability & Energy Efficiency