Pilkington float line
The operation in St Helens, UK produces more than 550 tonnes of glass every day and runs 24-hours-a-day, 7 days a week.
In the videos, four engineers walk you through the whole process, from raw materials arriving at the site and being melted in the furnace, the float bath of molten tin and the critical cooling process, to the plate-cutting and quality-control processes and the distribution and warehousing of the final product.
The first video will be available soon, so watch this space!
Contact:
Pilkington United Kingdom Limited,
Greengate Works,
Sherdley Road,
St. Helens,
Merseyside,
United Kingdom,
WA9 5 DZ
Phone: 01744 692000
Fax: 01744 692569
Visit Pilkington Building Products' website
Wood wool acoustic panelling with a black finish from Troldtekt has been specified throughout 6 Embassy Gardens at Nine Elms in London
Posted in Acoustics, Noise & Vibration Control, Articles, Ceilings, PostsTwo lifts, designed and manufactured in the UK by Stannah now take pride of place as part of London’s Elizabeth Tower restoration project
Posted in Articles, Lifts, Posts, Restoration & Refurbishment, Retrofit & RenovationAluminium windows, doors and curtain wall solutions manufacturer, Senior Architectural Systems has appointed Mark Rossouw to the newly created role of major projects manager
Posted in Articles, Building Industry News, Doors, Posts, Recruitment, WindowsKingfisher Louvres has made four of its most popular screening and single bank weather louvres available to specify via the NBS Source platform
Posted in Air Conditioning, Articles, Facades, Heating, Ventilation and Air Conditioning - HVAC, Posts, Ventilation