Alumasc has supplied its Euroroof SupaGOLD roofing system to London Metropolitan Police Authority’s Quicksilver Patrol Base.
A total of 2,200m2 of the SupaGOLD waterproofing system was specified by Vinci Facilities following numerous historic patchwork repairs to the existing system.
The company commissioned Alumasc to perform a site survey of all flat roof areas, who determined that the original system’s integrity was seriously compromised, with high levels of ponding, standing water and leakage to the main roof area.
The company advised its SupaGOLD waterproofing system as a suitable replacement that would fulfil the requirement of being independently insured for up to 20 years.
Approved installer TR Freeman was appointed to install Alumasc’s Euroroof SupaGOLD Warm Roof System to ensure that effective water management was maintained across the surface of the roof and eliminate the ongoing problems of standing water.
The waterproofing system also included the installation of Alumasc bespoke roof lights to replace the originals.
Prior to the installation of Euroroof SupaGOLD, appropriate surface preparation was undertaken to provide immediate protection against water ingress into the main building and offices below.
The Alumasc cut to falls (tapered) scheme was designed to enhance and overcome the existing design falls to each respective roof area. The design brief for the drainage plan was to utilise the existing drainage locations, remove standing water from all roof areas and meet the target u-value of an average 0.18W/m2K.
The Euroroof SupaGOLD waterproofing system, comprising a vapour barrier, PU bonded PIR Insulation SUPA XL Underlay and capping sheet, was then installed.
Alumasc Roofing Systems
White House Works
Bold Road
Sutton
St Helens
Merseyside
WA9 4JG
UK
+44 (0) 3335 771 500
Visit Alumasc Roofing Systems website
The latest Builders Merchant Building Index (BMBI) report shows builders’ merchants’ value sales in October were up +1.2% compared to the same month last year.
Posted in Articles, Bathrooms & Toilets, Bricks & Blocks, Building Associations & Institutes, Building Industry News, Building Products & Structures, Building Services, Building Systems, Civil Engineering, Cladding, Concrete, Cement, Admixtures, Drainage, Drainage Services, Floors, Garden, Hand Tools, Hard Landscaping & Walkways, Health & Safety, Heating Systems, Controls and Management, Heating, Ventilation and Air Conditioning - HVAC, Information Technology, Interior Design & Construction, Interiors, Landscaping, news, Paints, Paints, Coatings & Finishes, Pipes, Pipes & Fittings, Plant, Equipment and Hire, Plumbing, Power Tools, Publications, Research & Materials Testing, Restoration & Refurbishment, Retrofit & Renovation, Site Preparation, Sustainability & Energy Efficiency, Timber Buildings and Timber Products, Walls, Waste Management & RecyclingKids’ Village is delighted to have partnered with GEZE UK as their 2025 charity of the year – find out more via the article…
Posted in Access Control & Door Entry Systems, Architectural Ironmongery, Articles, Building Industry Events, Building Industry News, Building Products & Structures, Building Services, Charity work, Doors, Facility Management & Building Services, Health & Safety, Restoration & Refurbishment, Retrofit & Renovation, Security and Fire Protection, WindowsThe Encon Group, the leading independent distributor of building materials, is pleased to announce that it has been awarded Silver membership of The 5% Club by the 2024/25 Employer Audit Scheme.
Posted in Articles, Awards, Bricks & Blocks, Building Associations & Institutes, Building Industry Events, Building Industry News, Building Products & Structures, Building Regulations & Accreditations, Building Services, Building Systems, Civil Engineering, Cladding, Concrete, Cement, Admixtures, Facades, Hard Landscaping & Walkways, Health & Safety, Insulation, Landscaping, Plant, Equipment and Hire, Recruitment, Restoration & Refurbishment, Retrofit & Renovation, Site Preparation, Training, WallsLocated in Charlton, South London, SWA member West Leigh was established during the Blitz, in 1943. During the destruction in London, the company helped in repairing windows and facades that had been damaged by bombings throughout the city.
Posted in Articles, Building Associations & Institutes, Building Industry News, Building Products & Structures, Building Services, Building Systems, Case Studies, Facades, Glass, Glazing, Restoration & Refurbishment, Retrofit & Renovation, Steel and Structural Frames, Walls, Windows