Altius releases webinar on contractor and subcontractor management

  • 25 May 2017

Altius VA has released a webinar recording with five steps to ensure effective contractor and subcontractor management and compliance.

Gary Plant, Managing Director of Altius VA explains in the seminar how organisations can reduce costs, boost efficiency and avoid risk when working with contractors and their sub contractors.

Gary explains that you should have requirements on health and safety in place and the do’s and don’ts of the contract should be established and no assumptions made.

He also states that you should ensure that your contractors are capable of doing the job and won’t expose you to risk. They should provide you with clear evidence of having completed risk assessments, having safety management systems etc.

The webinar also discusses the importance of clearly communicating your requirements. No assumptions should be made when dealing with contractors and sub-contractors, particularly around their skills and attitudes to health and safety. It is also worth highlighting and communicating the things you don’t want them to do.

You should also monitor compliance to measure whether the job is going well. If something is going wrong, it’s usually too late to do anything about the situation, but it could be a useful learning point for next time. KPIs, audits, site inspections and a feedback process may all have a role to play.

Finally, according to Gary you should keep records of contractors and sub-contractors and make sure you have up-to-date evidence of their capabilities. Don’t waste time doing what a computer can do, automate your supplier management processes. This will make appointing new contractors and sub-contractors easy and ensure that their performance is tracked.

You can watch the webinar ‘Top 5 Tips for Managing your Contractors and Sub Contractors’ here.

Contact:

Phone: 01332 960320
Email: [email protected]

Visit Altius VA's website

Leave a Reply

Latest news

Acoustic panelling from Troldtekt creates striking effect at 6 Embassy Gardens

Wood wool acoustic panelling with a black finish from Troldtekt has been specified throughout 6 Embassy Gardens at Nine Elms in London

Posted in Acoustics, Noise & Vibration Control, Articles, Ceilings, Posts

Passenger lifts from Stannah elevate safety and accessibility at Elizabeth Tower

Two lifts, designed and manufactured in the UK by Stannah now take pride of place as part of London’s Elizabeth Tower restoration project

Posted in Articles, Lifts, Posts, Restoration & Refurbishment, Retrofit & Renovation

Senior Architectural Systems appoints new major projects manager

Aluminium windows, doors and curtain wall solutions manufacturer, Senior Architectural Systems has appointed Mark Rossouw to the newly created role of major projects manager

Posted in Articles, Building Industry News, Doors, Posts, Recruitment, Windows

Aluminium architectural louvre products from Kingfisher now available on NBS Source

Kingfisher Louvres has made four of its most popular screening and single bank weather louvres available to specify via the NBS Source platform

Posted in Air Conditioning, Articles, Facades, Heating, Ventilation and Air Conditioning - HVAC, Posts, Ventilation