Protan provides solution for final phase of regeneration

  • 14 Aug 2017

Walsall Waterfront in the heart of the Black Country is in its second and final phase of regeneration.

This final phase includes the culmination of Kier Property’s redevelopment of 17 acres of previously vacant and derelict land to the north of the town centre.  The ultimate element is the construction of two units- one some 570m2, divided into three, and the other a stand-alone 325m2 structure.

Main contractor PPE has employed sub-contractor FCB Roofing to handle the construction of the roofs on both buildings. 

Protan SE1.6mm thick polyester-reinforced PVC single ply membrane covers the shallow pitch metal deck, mechanically fixed, and detailed around the M&S penetrations and access hatches on each block.

FCB Roofing’s Alan Horton, “One of the main objectives of the strategy behind the development is the delivery of high quality public realm, using appropriate materials to help ensure provision of well-designed, sustainable buildings. We have an established relationship with PPE, based on and as a result of Protan, so the brand was a preferred choice from the outset.”

Protan SE membrane is certified to deliver, and potentially surpass, the energy efficiency requirements laid down in Approved Document L, and, under the Green Guide, achieve an A+ rating. Protan membranes achieve durability in excess of 30 years, with air leakage controlled in line with latest Building Regulations, and are fully BBA certified.

Protan UK,
256 Europa Boulevard,
Gemini Business Park,
Warrington,
WA5 7TN

Visit Protan UK's website

Leave a Reply

Latest news

Acoustic panelling from Troldtekt creates striking effect at 6 Embassy Gardens

Wood wool acoustic panelling with a black finish from Troldtekt has been specified throughout 6 Embassy Gardens at Nine Elms in London

Posted in Acoustics, Noise & Vibration Control, Articles, Ceilings, Posts

Passenger lifts from Stannah elevate safety and accessibility at Elizabeth Tower

Two lifts, designed and manufactured in the UK by Stannah now take pride of place as part of London’s Elizabeth Tower restoration project

Posted in Articles, Lifts, Posts, Restoration & Refurbishment, Retrofit & Renovation

Senior Architectural Systems appoints new major projects manager

Aluminium windows, doors and curtain wall solutions manufacturer, Senior Architectural Systems has appointed Mark Rossouw to the newly created role of major projects manager

Posted in Articles, Building Industry News, Doors, Posts, Recruitment, Windows

Aluminium architectural louvre products from Kingfisher now available on NBS Source

Kingfisher Louvres has made four of its most popular screening and single bank weather louvres available to specify via the NBS Source platform

Posted in Air Conditioning, Articles, Facades, Heating, Ventilation and Air Conditioning - HVAC, Posts, Ventilation