The new Armstrong Ceiling Solutions European HQ

  • 22 Nov 2017

Armstrong Ceiling Solutions has recently moved offices, now showcasing its systems at its new European headquarters – Harman House.

Screen Shot 2017-11-22 at 14.34.32The open-plan 9,000ft2 office benefits from breakout areas, informal and formal meeting areas, and a reception – maximising collaboration in open areas and providing extra privacy when required.

Area designed and fitted out the new headquarters with B-H300 metal tiles on a 200m wide C-Profile grid in the reception area, MicroLook 8 metal lay-in tiles on a Prelude 15 grid in the breakout areas, and TechZone and Ultima+ mineral tiles in boardrooms.

Armstrong’s TrioGuard system also features in the reception and breakout spaces, to optimise acoustics and natural light whilst providing a high-performance dirt-resistant coating for metal ceiling tiles.

Project consultant Carl Burne comments: “We have used Armstrong ceilings on a huge amount of our projects and will continue to do as they are a market leader. At Harman House, the Armstrong products look great and have performed exactly as we had hoped.”

Contact:

Armstrong World Industries Limited
Harman House,
2nd Floor,
1 George Street,
Uxbridge UB8 1QQ
0800 371849

email: [email protected]  

Visit Armstrong Ceiling's website

Leave a Reply

Latest news

BMBI
GEZE
Encon
SWA

SWA: A focus on Steel Window Association member West Leigh

Located in Charlton, South London, SWA member West Leigh was established during the Blitz, in 1943. During the destruction in London, the company helped in repairing windows and facades that had been damaged by bombings throughout the city.

Posted in Articles, Building Associations & Institutes, Building Industry News, Building Products & Structures, Building Services, Building Systems, Case Studies, Facades, Glass, Glazing, Restoration & Refurbishment, Retrofit & Renovation, Steel and Structural Frames, Walls, Windows