The new Armstrong Ceiling Solutions European HQ

  • 22 Nov 2017

Armstrong Ceiling Solutions has recently moved offices, now showcasing its systems at its new European headquarters – Harman House.

Screen Shot 2017-11-22 at 14.34.32The open-plan 9,000ft2 office benefits from breakout areas, informal and formal meeting areas, and a reception – maximising collaboration in open areas and providing extra privacy when required.

Area designed and fitted out the new headquarters with B-H300 metal tiles on a 200m wide C-Profile grid in the reception area, MicroLook 8 metal lay-in tiles on a Prelude 15 grid in the breakout areas, and TechZone and Ultima+ mineral tiles in boardrooms.

Armstrong’s TrioGuard system also features in the reception and breakout spaces, to optimise acoustics and natural light whilst providing a high-performance dirt-resistant coating for metal ceiling tiles.

Project consultant Carl Burne comments: “We have used Armstrong ceilings on a huge amount of our projects and will continue to do as they are a market leader. At Harman House, the Armstrong products look great and have performed exactly as we had hoped.”

Contact:

Armstrong World Industries Limited
Harman House,
2nd Floor,
1 George Street,
Uxbridge UB8 1QQ
0800 371849

email: [email protected]  

Visit Armstrong Ceiling's website

Leave a Reply

Latest news

Enfield
Abloy
MCRMA

MCRMA Member Profile: David Roy, Director of Roofconsult

David Roy of MCRMA member company Roofconsult has more than 50 years’ experience to draw upon working in the building envelope sector and a unique perspective on how it has changed in that time.

Posted in Articles, BIM, Infrastructure & CAD Software, Building Associations & Institutes, Building Industry News, Building Products & Structures, Building Services, Building Systems, Cladding, Information Technology, Restoration & Refurbishment, Retrofit & Renovation, Roofs, Walls

Strand