Abloy UK

A key interactive webinar from Abloy UK

  • 8 May 2018

Security expert Abloy UK is holding an interactive webinar at 10am on Thursday 24th May, centring on the theme ‘When is a key more than just a key?’.

Hosted by Pip Courcoux, Sales and Product Manager – CLIQ Systems and Steve Wintle, Head of CNI at Abloy UK, the webinar will feature discussions on security integration and how organisations can hold strict standards required for security whilst enhancing operational efficiencies.

To join the webinar, visit https://meet.assaabloy.net/com/pip.courcoux/USABMI41

Pip explains: “Technology has come a long way since the invention of the key, and systems such as CLIQ now offer a wide scope of benefits to organisations, including increased operational efficiencies and cost savings, in addition to high security.

Abloy UK

Pip Courcoux

“Keys are no longer ‘just keys’ in the traditional sense, they have become technologically connected devices.

“This opens up a realm of opportunities, including integration with existing Enterprise Resource Planning, H & S, Competence, Permit to Work, Telemetry and SCADA systems.

“In the critical infrastructure space, the hybrid between mechanical and electronic technologies is ‘key’ to its success, improving planning and control processes.

“Users have secure access to an online management application from anywhere in the world and can change key access permissions, profiles, schedules and validity, even revoking their use virtually at the click of a button.

“Keys can be validated daily, weekly or monthly keeping them continuously secure, and audit trails are generated.

“What’s more, physical security can be integrated with existing telemetry systems to help control and manage operations.”

Abloy UK

Steve Wintle

Contact:

Abloy UK,
Portobello Works,
School Street,
Willenhall,
West Midlands,
WV13 3PW

Phone: 01902 364500
Fax: 01902 364501

Visit Abloy UK's website

Leave a Reply

Latest news

BMBI
GEZE
Encon
SWA

SWA: A focus on Steel Window Association member West Leigh

Located in Charlton, South London, SWA member West Leigh was established during the Blitz, in 1943. During the destruction in London, the company helped in repairing windows and facades that had been damaged by bombings throughout the city.

Posted in Articles, Building Associations & Institutes, Building Industry News, Building Products & Structures, Building Services, Building Systems, Case Studies, Facades, Glass, Glazing, Restoration & Refurbishment, Retrofit & Renovation, Steel and Structural Frames, Walls, Windows