Sidey ensuring windows can be first fixed quickly

  • 4 Jun 2018

Timber frame and SIPs panel manufacturers can quicken the installation of windows and doors by using the Sidey Kitfix system.

Pressure is on for builders and developers to get on and off-site faster, which means ways at reducing the time spent installing windows and doors need to be considered.

Steve Hardy, MD of fenestration and offsite construction specialists Sidey Solutions, has spoken about the Kitfix System, which allows windows and doors to be fitted quickly accurately at the factory stage.

“11 windows can be first fixed in 23 minutes. They are installed when the walls are horizontal in the factory and the innovative Kitfix brackets are twist fitted to the window or door frame. Air tightness, thermal and acoustic seals can also be included at this stage,” he said.

“This system makes transportation simple and once on site, the panels are erected as normal. This means homes are wind, watertight and secure much sooner, and makes the build much faster. It also eliminates the need for separate deliveries of windows and doors, with no site storage required either.

“The latest changes to planning laws announced on 5 March mean there is even more pressure to get the job done quicker,” adds Steve. “Choosing Kitfix to install windows and doors will help builders and developers build fast.”

Contact:

Sidey,
53 Feus Road,
Perth,
PH1 2AX

Visit Sidey's website

Leave a Reply

Latest news

FIT Show 2025 Launches Innovative Marketplace Feature to Enhancing Value for Installers

FIT Show, the UK’s leading event for the window, door, flat glass, hardware, and roofing industries, is excited to announce the launch of a brand new Marketplace feature at its upcoming 2025 event (Birmingham NEC, 29 April – 1 May).

Posted in Architectural Ironmongery, Articles, Building Industry Events, Building Industry News, Building Products & Structures, Doors, Exhibitions and Conferences, Glass, Glazing, Hand Tools, Innovations & New Products, Plant, Equipment and Hire, Power Tools, Restoration & Refurbishment, Retrofit & Renovation, Roofs, Seminars, Training, Windows

Hi-spec deployment of EJOT Colorfast at new Birmingham logistics park

EJOT Colorfast fasteners have been used extensively in the construction of eight new high-specification warehousing and logistics buildings at the Urban 8 Logistics Park in King’s Norton, Birmingham.

Posted in Articles, Building Industry News, Building Products & Structures, Building Systems, Case Studies, Facades, Restoration & Refurbishment, Retrofit & Renovation, Roofs, Walls

SWA member delivers ‘fresh Hope’ for university’s Sustainable Building department

A detailed contract to restore an iconic Art Deco building in the heart of Birmingham’s Jewellery Quarter was carried out by Steel Window Association member, The Window Repair Company (Northwest) Limited.

Posted in Articles, Building Associations & Institutes, Building Industry News, Building Products & Structures, Building Systems, Case Studies, Glass, Glazing, Restoration & Refurbishment, Retrofit & Renovation, Steel and Structural Frames, Sustainability & Energy Efficiency, Windows

Gilberts Takes Thermal Comfort to New Heights

Gilberts Blackpool is continuing to build on its reputation as a pioneer with the unveiling of ThermaAstute™ – the most extensive range of thermally sensitive diffusers in the market.

Posted in Air Conditioning, Articles, Building Industry News, Building Products & Structures, Building Services, Facility Management & Building Services, Heating, Ventilation and Air Conditioning - HVAC, Innovations & New Products, Restoration & Refurbishment, Retrofit & Renovation, Sustainability & Energy Efficiency