IG Lintels

A stunning collaboration of onsite and offsite building techniques: an IG Masonry Support case study

  • 27 Feb 2020

Recognising the benefits of offsite construction methods, Clearview Homes chose to approach IG Masonry Support to design a practical solution for achieving six large brick slip apex lintels for an exclusive West London development.

Oak Grove is situated in the urban district of Acton – the five contemporary properties exhibit impressive architectural features, demonstrating Clearview Homes’ attention to detail when it comes to brick elements.

Designed and built to an exceptional standard, it is truly an impeccable collaboration of both on-site and off-site building techniques.

The Challenge

Clearview Homes’ Oak Grove development sought six large prefabricated brick slip apex lintels on the Shaa Road development.

The apex was a crucial element of the design, as it guaranteed the development was in keeping with the existing gable-front properties on the street.

IG designed an off-site solution to span the 3269mm opening, carefully considering the installation process to minimise the time period contractors were working at heights.

IG received a consignment of the Wienerberger Downton Red brick type, so that the off-site installation blended seamlessly with brickwork constructed on-site.

At 515mm, the lintel section’s height equates to seven courses of brick bonded in a stretcher-bond pattern – the lintel also required a three course deep brick soffit to accommodate the recessed opening below and to make sure no structural steel was visible once built-in.

IG Lintels

The Solution

The prefabricated brick slip apex lintels were delivered to site and simply lifted into position using a crane. The end bearing plates of the apex were built into the brickwork below, ensuring the installation was level and suitably bedded into mortar.

Tapered brickwork was then built above the end bearing to fill the wedged section and facilitate a smooth transition into the apex. The mortar joints between brick slips were then pointed to allow for the seamless integration of the prefabricated component.

A stone coping provided the perfect finishing touch to the apex arches. Mechanical fixings were required in order to secure the stone to the sloped steel lintel.

IG designed a number of small angles to be tech screwed into the backing steel of the brick slip lintel, securing the coping via a dowel restraint into the stone.

The effective combination of onsite and offsite building techniques demonstrates the benefits of modern building methods, streamlining the process and enabling swift assembly on site. 

Visit the IG Lintels website

Download Hi-therm+ Brochure

Download IG Brick Slip Feature Lintels Brochure

Leave a Reply

Latest news

BMBI
GEZE
Encon
SWA

SWA: A focus on Steel Window Association member West Leigh

Located in Charlton, South London, SWA member West Leigh was established during the Blitz, in 1943. During the destruction in London, the company helped in repairing windows and facades that had been damaged by bombings throughout the city.

Posted in Articles, Building Associations & Institutes, Building Industry News, Building Products & Structures, Building Services, Building Systems, Case Studies, Facades, Glass, Glazing, Restoration & Refurbishment, Retrofit & Renovation, Steel and Structural Frames, Walls, Windows