As the UK experiences torrential rain and storm-level events, contractors need to consider the long-term damage ‘invisible water’ can have on their flood–hit construction sites, say Aggreko.
The company believes that, although site workers and managers may think assessing damage and replacing equipment is the final recovery step after pumping out floodwater, water soaked into materials could prove catastrophic in the long term.
By soaking into substances such as wood, plaster and paint, this ‘invisible water’ may cause expensive long-term damage to affected materials as site managers heat flooded buildings to aid the drying out process.
What’s more, mould growth can occur during this process, putting the health of on-site personnel at risk.
Delivering optimum climate control in industrial environments is therefore vital to preserving the integrity of affected buildings and ensuring construction can restart safely.
Through the use of dehumidifiers to create a controlled environment and manage moisture levels, site managers can guarantee that surrounding air is dried appropriately and without risk following floods.
Ryan Stanley, Sector Development Manager for Temperature and Moisture Control at Aggreko, commented: “In the event of a flood, it is extremely important that the recovery process happens quickly.
“Yet quickly does not always mean safely – in the rush to continue construction, crucial steps can be missed when drying out buildings.
“It is vital that a controlled environment is maintained when drying and dehumidifying affected rooms and equipment. With that in mind, industrial dehumidifiers, such as those from Aggreko, should be a top priority for site managers struck by flooding.
“If the worst does occur, these temporary solutions can be hired to manage moisture levels until the site is back and running as normal, with the threat posed by ‘invisible water’ eliminated.”
The latest Builders Merchant Building Index (BMBI) report shows builders’ merchants’ value sales in October were up +1.2% compared to the same month last year.
Posted in Articles, Bathrooms & Toilets, Bricks & Blocks, Building Associations & Institutes, Building Industry News, Building Products & Structures, Building Services, Building Systems, Civil Engineering, Cladding, Concrete, Cement, Admixtures, Drainage, Drainage Services, Floors, Garden, Hand Tools, Hard Landscaping & Walkways, Health & Safety, Heating Systems, Controls and Management, Heating, Ventilation and Air Conditioning - HVAC, Information Technology, Interior Design & Construction, Interiors, Landscaping, news, Paints, Paints, Coatings & Finishes, Pipes, Pipes & Fittings, Plant, Equipment and Hire, Plumbing, Power Tools, Publications, Research & Materials Testing, Restoration & Refurbishment, Retrofit & Renovation, Site Preparation, Sustainability & Energy Efficiency, Timber Buildings and Timber Products, Walls, Waste Management & RecyclingKids’ Village is delighted to have partnered with GEZE UK as their 2025 charity of the year – find out more via the article…
Posted in Access Control & Door Entry Systems, Architectural Ironmongery, Articles, Building Industry Events, Building Industry News, Building Products & Structures, Building Services, Charity work, Doors, Facility Management & Building Services, Health & Safety, Restoration & Refurbishment, Retrofit & Renovation, Security and Fire Protection, WindowsThe Encon Group, the leading independent distributor of building materials, is pleased to announce that it has been awarded Silver membership of The 5% Club by the 2024/25 Employer Audit Scheme.
Posted in Articles, Awards, Bricks & Blocks, Building Associations & Institutes, Building Industry Events, Building Industry News, Building Products & Structures, Building Regulations & Accreditations, Building Services, Building Systems, Civil Engineering, Cladding, Concrete, Cement, Admixtures, Facades, Hard Landscaping & Walkways, Health & Safety, Insulation, Landscaping, Plant, Equipment and Hire, Recruitment, Restoration & Refurbishment, Retrofit & Renovation, Site Preparation, Training, WallsLocated in Charlton, South London, SWA member West Leigh was established during the Blitz, in 1943. During the destruction in London, the company helped in repairing windows and facades that had been damaged by bombings throughout the city.
Posted in Articles, Building Associations & Institutes, Building Industry News, Building Products & Structures, Building Services, Building Systems, Case Studies, Facades, Glass, Glazing, Restoration & Refurbishment, Retrofit & Renovation, Steel and Structural Frames, Walls, Windows