Dune eVo ceiling tiles

Armstrong launches improved Dune eVo ceiling tiles

  • 23 Jun 2017

Armstrong Ceiling Solutions has redeveloped its range of Dune eVo ceiling tiles, to offer a sustainable solution with ease of installation in mind.

The Dune eVo range has been redeveloped in response to feedback from Armstrong’s customers: the products have been designed to meet demand for ceiling systems that are easy to handle and install.

The launch, which officially took place on 21st June at Mercedes World, marks the fifth evolution of Armstrong’s Dune series since its introduction in 1984. 

Dune eVo ceiling tiles

The Dune eVo, Dune eVo dB and Dune eVo Max have been reinforced with a painted edge to improve resilience, and acoustically enhanced. The products now provide an acoustic performance of up to 0.65 aw, Class C sound absorption and a sound attenuating performance of around 39dB.

Dune eVo ceiling tiles

Armstrong aspired to create ceiling tiles that can add value to a project at every phase, focusing on design and specification, through to installation and afterlife.

All three Dune eVo products are completely recyclable; Dune eVo and Dune eVo Max also offer cradle-to-cradle sustainability accreditation. They have been designed to help sub-contractors to achieve successful installations at a faster rate, whilst meeting environmental specifications and sustainability targets.

Contact:

Armstrong World Industries Limited
Harman House,
2nd Floor,
1 George Street,
Uxbridge UB8 1QQ
0800 371849

email: [email protected]  

Visit Armstrong Ceiling's website

Leave a Reply

Latest news

Acoustic panelling from Troldtekt creates striking effect at 6 Embassy Gardens

Wood wool acoustic panelling with a black finish from Troldtekt has been specified throughout 6 Embassy Gardens at Nine Elms in London

Posted in Acoustics, Noise & Vibration Control, Articles, Ceilings, Posts

Passenger lifts from Stannah elevate safety and accessibility at Elizabeth Tower

Two lifts, designed and manufactured in the UK by Stannah now take pride of place as part of London’s Elizabeth Tower restoration project

Posted in Articles, Lifts, Posts, Restoration & Refurbishment, Retrofit & Renovation

Senior Architectural Systems appoints new major projects manager

Aluminium windows, doors and curtain wall solutions manufacturer, Senior Architectural Systems has appointed Mark Rossouw to the newly created role of major projects manager

Posted in Articles, Building Industry News, Doors, Posts, Recruitment, Windows

Aluminium architectural louvre products from Kingfisher now available on NBS Source

Kingfisher Louvres has made four of its most popular screening and single bank weather louvres available to specify via the NBS Source platform

Posted in Air Conditioning, Articles, Facades, Heating, Ventilation and Air Conditioning - HVAC, Posts, Ventilation