CCF

Be sure to get regulation ready with CCF

  • 18 Oct 2023

Leading insulation, drywall, and ceilings products distributor CCF has a dedicated in-house technical team on hand ready to support customers in meeting the latest wave of construction industry regulations, including the mandatory requirements of Part L.   

With strong links with both contractors and product manufacturers, as a distributor CCF is well placed to help support the greater use of energy-efficient and compliant building products and can offer the full range of solutions from external envelope and interior insulation and passive fire protection materials, to ceilings and dry lining.

The CCF technical team is seeing significant growth in demand for its services and can provide a dedicated resource to assist both specialist installers and main contractors in finding the most suitable products to meet individual project requirements and budgets. The team can also provide guidance on achieving compliance with the necessary Building Regulations, safety standards and sustainability targets.

CCF

Working closely

CCF’s technical team works closely with its customers at every stage of a project to provide competent and clear technical advice. This collaboration also brings together CCF’s sales team and the supplying branch to offer greater reliability, transparency, and continuity of service.

A key part of the team’s service offering is helping customers identify the most energy and cost-efficient combination of construction materials to meet the new lower U-value targets of Part L of the building regulations. The team is ready to increase its support of housebuilders and developers since the transitional arrangements period of Part L 2021 ended in June 2023. 

As well as drawing on the industry experience and technical expertise within its dedicated technical team, CCF is constantly looking at the future needs of the construction industry to ensure it can offer market leading services to support changing regulations and sustainability requirements.

To talk to CCF’s technical team about your next project, contact [email protected].

For more information, visit www.ccfltd.co.uk 

Leave a Reply

Latest news

BMBI
GEZE
Encon
SWA

SWA: A focus on Steel Window Association member West Leigh

Located in Charlton, South London, SWA member West Leigh was established during the Blitz, in 1943. During the destruction in London, the company helped in repairing windows and facades that had been damaged by bombings throughout the city.

Posted in Articles, Building Associations & Institutes, Building Industry News, Building Products & Structures, Building Services, Building Systems, Case Studies, Facades, Glass, Glazing, Restoration & Refurbishment, Retrofit & Renovation, Steel and Structural Frames, Walls, Windows