Paul Wright, Service Director at dormakaba explains why planned door maintenance and servicing is vital to ensure systems and access solutions continue to work safely, effectively and remain compliant with building regulations.
When budgets are tight, it can be tempting to postpone or disregard what is perceived as non-essential planned maintenance and servicing. However, when it comes to door solutions, planned services are absolutely crucial.
Should a manual door not be maintained properly, it can stick, become noisy, slam shut, operate too slowly or fail to close fully. This can then become a security issue and should the door in question be a fire door – it is potentially deadly.
Under the Regulatory Reform Act 2005 and BS8214 fire doors, (and any other equipment provided in connection with firefighting, fire detection and warning as well as emergency routes and exits), should have a maintenance schedule and be examined every six months by a competent person. This will ensure system reliability in an event of a fire and keep the building safe.
In addition, for manual doors building regulations also state that, “…a door must have an opening force of below 30N between 0 and 30 degrees and below 22.5N between 30 and 60 degrees…” Without regular maintenance of all door fittings the resistances to opening and closing can increase to an extent that the ability of people to pass through the door may be affected. This means that the system would be in direct violation of the 2010 Equality Act. Consequently, the building owner could then be liable for not ensuring ease of access for all users.
Automatic doors are regulated by BS EN 16005:2012, Power Operated Pedestrian Doorsets – Safety in Use. This means that automatic doors, including their protective devices, sensors, safety systems and equipment have to be regularly maintained according to the manufacturer’s specification by a qualified engineer at least once a year; records of maintenance must also be kept in order to meet legal responsibilities. Failure to regularly service automatic doors could put the health and safety of building users at risk, and if systems fail, can cause closure and downtime.
Access control solutions, if faulty, can also affect the complete building and its overall security. The British Security Industry Association’s (BSIA) guide to access control systems can provide vital best practice guidance.
When maintaining an access solution, a Service Level Agreement (SLA) should be agreed with a qualified maintenance provider, this should include a preventative maintenance schedule (at least once per annum) detailing what is to be tested, including an audit of cards, badges or ID media, alarm inputs and responses, uninterrupted Power Supplies (UPS) batteries as well as response and repair times expected.
For software-based systems, most manufacturers will offer a Software Support Agreement (SSA). This will allow your system integrator to maintain the software to the latest version available, which will provide the latest features but will most importantly also allow compatibility and testing with the latest release of operating systems on the market.
By regularly servicing door systems, in accordance to the relevant health and safety legislation and British Standards, expensive repairs and replacements can be pre-empted and business downtime of inactive doors can be reduced. Regular maintenance can also improve the system’s life expectancy by ensuring that all variables are working correctly. This will also help to avoid components experiencing wear from over-compensation that over time could result in expensive repair work or an entirely new system.
There really is a multitude of factors to take into account when it comes to the correct specification and long-term maintenance of doors and servicing of access control systems. As such, it is advisable to select products from a reputable manufacturer, have a qualified installer undertake the work and take advantage of the benefits a service partner can provide.
The latest Builders Merchant Building Index (BMBI) report shows builders’ merchants’ value sales in October were up +1.2% compared to the same month last year.
Posted in Articles, Bathrooms & Toilets, Bricks & Blocks, Building Associations & Institutes, Building Industry News, Building Products & Structures, Building Services, Building Systems, Civil Engineering, Cladding, Concrete, Cement, Admixtures, Drainage, Drainage Services, Floors, Garden, Hand Tools, Hard Landscaping & Walkways, Health & Safety, Heating Systems, Controls and Management, Heating, Ventilation and Air Conditioning - HVAC, Information Technology, Interior Design & Construction, Interiors, Landscaping, news, Paints, Paints, Coatings & Finishes, Pipes, Pipes & Fittings, Plant, Equipment and Hire, Plumbing, Power Tools, Publications, Research & Materials Testing, Restoration & Refurbishment, Retrofit & Renovation, Site Preparation, Sustainability & Energy Efficiency, Timber Buildings and Timber Products, Walls, Waste Management & RecyclingKids’ Village is delighted to have partnered with GEZE UK as their 2025 charity of the year – find out more via the article…
Posted in Access Control & Door Entry Systems, Architectural Ironmongery, Articles, Building Industry Events, Building Industry News, Building Products & Structures, Building Services, Charity work, Doors, Facility Management & Building Services, Health & Safety, Restoration & Refurbishment, Retrofit & Renovation, Security and Fire Protection, WindowsThe Encon Group, the leading independent distributor of building materials, is pleased to announce that it has been awarded Silver membership of The 5% Club by the 2024/25 Employer Audit Scheme.
Posted in Articles, Awards, Bricks & Blocks, Building Associations & Institutes, Building Industry Events, Building Industry News, Building Products & Structures, Building Regulations & Accreditations, Building Services, Building Systems, Civil Engineering, Cladding, Concrete, Cement, Admixtures, Facades, Hard Landscaping & Walkways, Health & Safety, Insulation, Landscaping, Plant, Equipment and Hire, Recruitment, Restoration & Refurbishment, Retrofit & Renovation, Site Preparation, Training, WallsLocated in Charlton, South London, SWA member West Leigh was established during the Blitz, in 1943. During the destruction in London, the company helped in repairing windows and facades that had been damaged by bombings throughout the city.
Posted in Articles, Building Associations & Institutes, Building Industry News, Building Products & Structures, Building Services, Building Systems, Case Studies, Facades, Glass, Glazing, Restoration & Refurbishment, Retrofit & Renovation, Steel and Structural Frames, Walls, Windows