04 February 2014

Installation time reduced with the use of Mapei complete system

A total of 500m2  of Mapei’s resin and cementitious flooring products was applied, as well as the company’s solvent free primer and surface finishes to provide an anti-dust and oil resistant surface. Mapei’s chemical and abrasion resistant Maplefloor I 350 SL was installed to create service tunnels for contractors working at New Street Station, which[…]

  • 04 February 2014

  • 03 February 2014

  • 31 January 2014

  • 30 January 2014

  • 28 January 2014

  • 28 January 2014

  • 24 January 2014

  • 23 January 2014

  • 23 January 2014

22 January 2014

Fully integrated door and window system to be displayed at Ecobuild

The system offers a 12 year guarantee and utilises 50% post-consumer recycled PVC-U as standard, with a 100% post-consumer version for customers needing the highest possible recycled material. A standard sash casement model will be displayed at the event to highlight the aesthetic benefits of Modus compared to traditional PVC-U window systems.

  • 22 January 2014