09 February 2015

Open water heat pump system specified for London project

The London hotel and apartments have benefited from the installation of Mitsubishi Electric’s open water heat pump system The Kingston Heights project was designed and developed by NHP Leisure Developments to gather low grade heat energy from the Thames and move it to a hotel and 137 apartments, which are located 200 metres from the[…]

  • 09 February 2015

04 February 2015

New CAD drawing for hygiene rooms in schools

Clos-o-Mat’s new CAD drawing is for hygiene rooms that have to meet size and equipment requirements The latest edition of the Department for Education’s Building Bulletin 103 declares that a specialist hygiene room of 12 square metres must be included in all mainstream secondary schools. The hygiene rooms must be built with enough space for assistants to[…]

  • 04 February 2015

02 February 2015

Demand for energy saving lamps helping build technology hub

Rt Hon Greg Clark MP, Minister for Universities, Science and Cities officially opens new LED Lighting Laboratory facility at Integral LED. Opportunity to build a new technology hub According to Sunil Kotecha, Integral’s MD, an opportunity exists to build a ‘Shenzhen style technology hub in Brent, North West London’ based upon the demand for innovative[…]

  • 02 February 2015

  • 02 February 2015

02 February 2015

Spotlight on LED quality and solutions at Ecobuild 2015

Visitors to the stand (S2026) will be able to discuss bespoke options for their own projects, whilst browsing the company’s extensive LUMiLife LED portfolio including LUMiLife high-output LED panels and LUMiLife GU10 LED spotlights. Laura Dugdale, marketing manager at LED Hut Trade: “With lighting such a huge contributor to our national energy consumption (and subsequent[…]

  • 02 February 2015

29 January 2015

Underfloor heating system from SchlUter for major self-build project

Stage 1 The radical transformation of the 19th century Chitterman House includes a number of eco-friendly and sustainable features. The main house and its outbuildings are being built in several stages. Link to more details of Stage one – the completion of the outbuildings, which consists of a gymnasium, pool house, games room and garage.[…]

  • 29 January 2015

29 January 2015

Stannah Microlift dumbwaiter for top London business members club

Arranged over six floors, Pavilion comprises a restaurant, bar, outside terrace, meeting rooms, private office suites, pods and lounges. Lifts support service in Pavilion The first Stannah Microlift was specified by Pavilion in 2011 followed by the second Stannah Microlift 50C. Now the food lifts work in tandem, ferrying food and drink an approximate 4000mm[…]

  • 29 January 2015

29 January 2015

New connecDIM integrated light management improves staff well-being

New connecDIM lighting controls for luminaires even small applications with only a few DALI devices can benefit from lighting controls Tridonic connecDIM integrated light management solution A long-term study conducted by Zumtobel, (Tridonic’s parent company) in cooperation with the Fraunhofer IAO has confirmed that the present lighting situation in many offices often does not meet the[…]

  • 29 January 2015

29 January 2015

Video on new schools educational programme about reducing energy

Learning Curve Mitsubishi Electric video highlights the benefits of their Learning Curve educational programme The Learning Curve is a half-day course for primary schools and children’s groups that is focused on how to ‘reduce, reuse and recycle’ and encourages the consumers of tomorrow to look at ways they can have an impact on reducing energy[…]

  • 29 January 2015

22 January 2015

Changing Places accessible toilet renovated at East Midlands Airport

East Midlands Airport’s Changing Places accessible toilet has been renovated with products from Clos-o-Mat Changing Places accessible toilets and hygiene rooms have been designed for disabled people that need the help of a carer for personal hygiene. The facilities are considered as ’desirable’ under under Building Regulations Approved Document M 2013 and regarded by BS8300:2009[…]

  • 22 January 2015