Stannah had the challenge to supply and install a space-saving passenger lift in a new extension to St John The Baptist Primary School in Penistone, South Yorkshire.
GEZE launches ‘Helping Healthcare to Heal’, an initiative to recognise that putting patients at the centre of hospital, clinic and doctors’ surgery building design can help in the process of healing and recovery.
After around nine years of construction, the Humboldt Forum is gradually opening its doors. It features the electronic eCLIQ locking system from ASSA ABLOY Opening Solutions.
SafeTrak makes time consuming paper based equipment inspections a lot faster. Planning, inspecting and reporting can be streamlined, customised and largely automated in the SafeTrak app to save time.