24 July 2015

Water-based Polyurethane Flortred for floor protection

The water-based floor paint has been developed to match the durability and performance of an equivalent solvent-based floor paint, with the additional benefits of low odour properties and faster drying time. The Quick Dry Polyurethane Flortred is able to withstand wear, scratches, oil and grease spillages, as well as boasting excellent hot tyre resistance. Interior[…]

  • 24 July 2015

24 July 2015

Block concrete paving products specified for Leicester re-development

Charcon was chosen to specify block paving products for the re-development the area, which was made famous by discovery of King Richard III in 2013. Charcon’s Andover Textured premium precast concrete paving was specified for the historic re-development The project was part of Leicester City Council’s ongoing street rejuvenation programme, receiving funding from the Heritage[…]

  • 24 July 2015

23 July 2015

Gypsum panels praised for preventing house fires from spreading

The Fermacell boards were the only element of an external wall insulation (EWI) project remaining after a semi-detached house went up in flames. The gypsum fibreboard panels survived the inferno The semi-detached house was one of the 4,000 post-war British Iron and Steel Federation (BISF) properties being refurbished to Decent Homes standards by Plymouth Community[…]

  • 23 July 2015

23 July 2015

Air source heat pumps installed at environmental Hebburn Eco Centre

Designed by Groundwork South Tyneside and Newcastle (STAN) and opened in 1996, the Eco Centre was a pioneering venture to demonstrate renewable technologies and sustainable design. Today, the Eco Centre remains one of Europe’s most sustainable buildings. Eco-friendly construction The complex was originally built using materials recycled from sustainable sources, including re-used bricks from a[…]

  • 23 July 2015

23 July 2015

Roof tiles specified for installation on new builds in idyllic areas

Redland’s Fenland Pantile roof tiles were specifically created for the South East and East Anglican markets, which favour a certain roof aesthetic. With their classic single pantile shape, the tiles provide an interlocking concrete format, enhancing their weather-tightness and robustness. Maintaining architectural identity The tiles were selected for use in two large scale housing projects,[…]

  • 23 July 2015

23 July 2015

Mineral tiles and ceiling and suspension systems specified for new hospital complex

The Queen Elizabeth University Hospital is currently the largest hospital building project in Europe. Taking a total of five years to build, the hospital is expected to treat 750,000 patients – including 110,000 Aandamp;E patients – a year. The Glasgow complex is divided into a children’s hospital and a larger adult’s hospital, comprising 30 operating[…]

  • 23 July 2015

23 July 2015

Ventilated façade system utilises off-site construction

The system has been designed to provide a fully ventilated cavity, which keeps the timber substrate moisture-free. Offering compliance with all UK building regulations, TRADA and NHBC, it is compatible with both render and brick slip finishes. Timber Basin development The Alumasc Ventilated System was used on the Timber Basin development in Glasgow – providing[…]

  • 23 July 2015

23 July 2015

Why is construction the UK’s most dangerous industry?

Fatal accidents in the workplace Should the construction industry be investing more money into health and safety measures? Research into government statistics from the Health & Safety Executive (HSE) by personal injury specialists Sure Claim looked at the level of workplace fatal accidents. Construction was the highest number of all the industrial sectors 31.5% (42)[…]

  • 23 July 2015

23 July 2015

Installer brand building with the Planitherm Installer Network

The Planitherm Installer Network Janet Foster has been appointed as the Network’s dedicated Brand Builder The Planitherm Installer Network aims to raise brand awareness with consumers through installers. Offering sales, marketing and training tools, it has been supporting its members with a range of resources for five years. The Installer Network offers a marketing portal,[…]

  • 23 July 2015

23 July 2015

Emergency communication system recognised at ESX 2015

PerfectSync synchronises audio, voice and strobe signals across Advanced’s Axis AX fire alarm networks dynamically as conditions change. Advanced’s VP of Engineering, Peter Bell, claimed the award Synchronisation of audio and visual signals across multiple notification zones, floors and areas prevents confusion in an emergency situation and aids in meeting indelibly standards. Live audio notifications[…]

  • 23 July 2015