A total of 80mm EPS insulation was applied on the majority of properties, with extruded polystyrene (XPS) insulation fitted in the lower areas of installation to prevent the risk of flooding.
A series of presentations took place throughout the three days from lift consultants and suppliers, concerning the changing demands of the lift industry and to showcase the latest lift systems.
The use of water saving products has allowed an energy consumption reduction of around 90%, enabling The Emerald to achieve a certification of level six in compliance with the Code for Sustainable Homes.
The warm air heating system can achieve 98% thermal efficiency with the inclusion of a secondary heat exchanger and fully modulating burner and combustion controls, designed to produce significant gas and electricity savings.
The company’s Demo 1 showroom spent 37,000 miles on the road and has operated a total of 10,000 times, visiting potential customers to exhibit the benefits of the doors.
The Emperor cleats are designed to offer a quick and easy installation process with an LSF zero halogen polymeric liner and base pad to cushion cables during short circuit conditions.
Over 400 Changing Places toilets have been installed since Clos-o-Mat launched its campaign for more accessible washrooms to be introduced in public places.