The second win will involve Stannah replacing 20 existing lift cars with new, energy saving equipment, alongside 29 replacements of lift doors on landings and lift cars.
The team also completed work for Stockport Homes, applying a fire-retardant coating to staircases, corridors, lift lobbies and a reception area at Hollywood Towers.
RonaBond Crack Bridging Anti-Carbonation Coating WB was specified due to its ability to protect facades against water ingress and the corrosion of steel reinforcement.
Flooring and monitoring machines were introduced in the kennels, alongside a heating system and new flooring to provide a comfortable environment for visiting dogs.