13 October 2014
Steel protection for Pleasure Beach following hot dip galvanising
Abro Engineering commissioned Acrow to replace parts of the 11 metre high water ride which required maintenance, with handrails, the main platform and parts of the flumes being replaced. The galvanising treatment helps to protect the steel in the wet environment and Acrow worked alongside the park to help ensure minimum impact on footfall.