BMBI
  • 02 August 2021

EverEdge
  • 26 July 2021

Alumasc WMS
  • 19 July 2021

Alumasc Gatic
  • 28 June 2021

Hydrorock
  • 28 June 2021

BMBI
  • 23 June 2021

Hydrorock

08 June 2021

Persistent highway flooding solved with multiple dispersed Hydrorock modules

Lizard Lane is a busy link road connecting the Whitburn and Marsden areas of South Tyneside. Frequent heavy rain and clay soil led to the carriageway remaining flooded for long periods, even after the rain had stopped. Fortunately, this issue was solved by Hydrorock.

  • 08 June 2021

BMBI
  • 26 May 2021

Pop Up Power
  • 19 May 2021

BMBI
  • 28 April 2021