22 August 2018 Hush Acoustics for residential development in Canterbury Posted on 22nd August 2018 by Max Banner A variety of solutions from Hush Acoustics have featured in a brand new residential development in Canterbury, Kent.
17 August 2018 Alumasc Roofing Systems’ Hydrotech and Derbigum star in London Posted on 17th August 2018 by Max Banner The Brunswick Shopping Centre in London has received Alumasc Roofing Systems’ Hydrotech Structural Waterproofing and a Derbigum Warm Roof.
16 August 2018 A synergy between contemporary and heritage achieved by Gilberts Posted on 16th August 2018 by Max Banner Through refining state of the art technology, Gilberts has played a vital role in helping bring a Grade II listed building into the 21st century.
15 August 2018 Hush helps Hashimoto family Sake Brewery in Cambridgeshire Posted on 15th August 2018 by Max Banner Hush Acoustics have played a crucial role in providing an acoustic solution for the Dojima Sake Brewery in Cambridgeshire.
15 August 2018 California glazing from C.R. Laurence for stadium Posted on 15th August 2018 by Max Banner C.R. Laurence has manufactured & supplied all-glass entrances, glass railings & bullet resistant transaction systems for the new Banc of California Stadium.
02 August 2018 99.3% quality rating courtesy of Lakes’ attention to detail Posted on 2nd August 2018 by Max Banner Lakes has reported a production quality rating of 99.3%, having recently been awarded ‘Best Bathroom Brand’ at the BMJ awards.
02 August 2018 Fibo panels mean new sales for Plumb Plus Supplies Posted on 2nd August 20187th August 2018 by Max Banner Fibo can count Plumb Plus Supplies as the latest plumbing, heating and bathroom merchant to add wall panels to its showroom.
02 August 2018 Selectaglaze secondary glazing for 600 year-old house Posted on 2nd August 2018 by Max Banner A 600 year old house in Kent has received a secondary glazing solution, courtesy of Selectaglaze.
01 August 2018 Gatic Slotdrain specified for UK’s largest Transatlantic port Posted on 1st August 2018 by Max Banner Peel Ports has finished its £400m three year project, Liverpool 2; it features Gatic Slotdrain for the pavement areas and Gatic’s access covers.
01 August 2018 New Kawneer commercial entrance door simply super Posted on 1st August 2018 by Max Banner Kawneer has launched an entrance door that not only offers class-leading thermal performance, but is so robust it comes with a lifetime guarantee.