New glazing systems were installed to the blocked off windows and roofing work was carried out in order to restore the department store to its former condition.
External redecoration has also been carried out during six weeks of work at the Knavesmire Stand at York Racecourse, with fire retardant paint applied to the stand in order to meet regulations.
The second win will involve Stannah replacing 20 existing lift cars with new, energy saving equipment, alongside 29 replacements of lift doors on landings and lift cars.
The team also completed work for Stockport Homes, applying a fire-retardant coating to staircases, corridors, lift lobbies and a reception area at Hollywood Towers.
RonaBond Crack Bridging Anti-Carbonation Coating WB was specified due to its ability to protect facades against water ingress and the corrosion of steel reinforcement.
Flooring and monitoring machines were introduced in the kennels, alongside a heating system and new flooring to provide a comfortable environment for visiting dogs.