The publication of the Phase 1 report from the Grenfell Tower Inquiry in October 2019 was yet another stark reminder, if one was needed, of the essential role that fire safety plays in all residential buildings, but particularly in high-rise blocks, according to Encasement.
Even though the Inquiry’s Chairman has said that fire sprinkler systems will form an important part of the Phase 2 investigation this year, many pro-active housing association and local authority landlords have already begun implementing major programmes of fire protection upgrades, including the retro-fitting of fire sprinkler systems.
As sprinklers need to be located within individual flats and communal areas to suppress fires and aid escape, incorporating them in new builds is comparatively simple, as they can be integrated at the building design stage and pipework can be hidden within wall cavities and ceiling voids.
For retro-fitted solutions, however, it’s not that straightforward, as in most cases the pipework will need to be surface mounted.
Once the sprinkler system pipework is installed, it needs to be concealed, as it provides a more aesthetic finish to each project and helps avoid potential complaints from tenants about unsightly orange pipes.
It also serves a practical purpose of containing the components and acting as a visible barrier to potential tampering or accidental damage.
One of the main advantages of surface mounted pipework, is the simplicity and speed with which it can be installed by skilled contractors, so it’s important that the chosen method of pipe boxing is also quick and easy, as installation time and the associated costs are essential considerations on any sprinkler project.
Consequently, these are key reasons why pre-formed and pre-finished solutions, such as Encasement’s Versa fire sprinkler pipe boxing, have become the preferred solution for many sprinkler contractors.
Versa ‘L’ shaped pipe boxing is manufactured from 5mm or 8mm thick plywood in a range of sizes and profiles and the system also includes dedicated accessories, such as internal and external corners, which help create an integrated finish and speeds the sprinkler installation.
All that’s needed to install the sprinkler pipe boxing on site is to drill the holes for sprinkler heads, cut to length and secure to the wall or ceiling with wood battens, screws and caps.
Encasement’s experience of working with contractors on countless social housing projects where pipework needs to be concealed has shown that Versa pipe and fire sprinkler boxing can be fitted in less than half the time of site made alternatives.
Also, as it is pre-finished with durable white melamine, there’s no painting required on site, which saves further time and cost.
For housing associations, local authorities and their contractors, this time saving provides a number of benefits. It helps ensure that fire safety upgrades can be completed within shorter timescales and simultaneously minimises the disruption for tenants while the work is being carried out.
Potentially the most important advantage is that the time taken to complete the projects can be reduced without compromising the quality or integrity of the installation, which can also reduce costs.
The over-riding aims must be to focus on helping save lives and enhance fire safety in high-rise residential buildings to avoid a repeat of the Grenfell tragedy.
Fire sprinkler systems have an important role to play and Versa boxing solutions can make a contribution to that process in terms of effectiveness, ease of installation and economics.
For more information on Encasement’s sprinkler boxing products, click here
To view Encasement’s pipe and sprinkler boxing project galleries, click here
Contact:
Encasement Ltd
Suite 7, Papyrus Business Parc
Papyrus Road
Werrington
Peterborough
Cambridgeshire PE4 5BH
The latest Builders Merchant Building Index (BMBI) report shows builders’ merchants’ value sales in October were up +1.2% compared to the same month last year.
Posted in Articles, Bathrooms & Toilets, Bricks & Blocks, Building Associations & Institutes, Building Industry News, Building Products & Structures, Building Services, Building Systems, Civil Engineering, Cladding, Concrete, Cement, Admixtures, Drainage, Drainage Services, Floors, Garden, Hand Tools, Hard Landscaping & Walkways, Health & Safety, Heating Systems, Controls and Management, Heating, Ventilation and Air Conditioning - HVAC, Information Technology, Interior Design & Construction, Interiors, Landscaping, news, Paints, Paints, Coatings & Finishes, Pipes, Pipes & Fittings, Plant, Equipment and Hire, Plumbing, Power Tools, Publications, Research & Materials Testing, Restoration & Refurbishment, Retrofit & Renovation, Site Preparation, Sustainability & Energy Efficiency, Timber Buildings and Timber Products, Walls, Waste Management & RecyclingKids’ Village is delighted to have partnered with GEZE UK as their 2025 charity of the year – find out more via the article…
Posted in Access Control & Door Entry Systems, Architectural Ironmongery, Articles, Building Industry Events, Building Industry News, Building Products & Structures, Building Services, Charity work, Doors, Facility Management & Building Services, Health & Safety, Restoration & Refurbishment, Retrofit & Renovation, Security and Fire Protection, WindowsThe Encon Group, the leading independent distributor of building materials, is pleased to announce that it has been awarded Silver membership of The 5% Club by the 2024/25 Employer Audit Scheme.
Posted in Articles, Awards, Bricks & Blocks, Building Associations & Institutes, Building Industry Events, Building Industry News, Building Products & Structures, Building Regulations & Accreditations, Building Services, Building Systems, Civil Engineering, Cladding, Concrete, Cement, Admixtures, Facades, Hard Landscaping & Walkways, Health & Safety, Insulation, Landscaping, Plant, Equipment and Hire, Recruitment, Restoration & Refurbishment, Retrofit & Renovation, Site Preparation, Training, WallsLocated in Charlton, South London, SWA member West Leigh was established during the Blitz, in 1943. During the destruction in London, the company helped in repairing windows and facades that had been damaged by bombings throughout the city.
Posted in Articles, Building Associations & Institutes, Building Industry News, Building Products & Structures, Building Services, Building Systems, Case Studies, Facades, Glass, Glazing, Restoration & Refurbishment, Retrofit & Renovation, Steel and Structural Frames, Walls, Windows