Dedicated monitoring and control solutions from Mabey Hire

  • 29 May 2015

The Monitoring and Control team offers a range of both structural and non-structural services for applications, including; environmental monitoring, equipment calibration and product testing.

The newly-formed team consists of experienced Geodetic, Geotechnic, Electronic Engineers, Civil/Structural Engineers and Hydraulic specialsts, providing access to a broad skill base which aims to support clients with efficient monitoring and measurement solutions.

As part of the service, clients have the flexibility to define their own level of involvement – from ‘hire-only’ through to fully-managed monitoring solutions.

An example of the new technologies that have been developed by the team is its Instrumentation Management System (IMS), which combines Geodetic and Geotechnic monitoring with propping and jacking systems for complete structural intelligence. The system can perform self-checks on data and comparative data to evaluate the quality of the source feeds.

The IMS can be accessed via a dedicated website – LiveSite – which provides a full graphical user interface for all aspects of the project, allowing almost unlimited manipulation of data. High and low frequency solutions have been designed to be ‘plug and play’ and upload to the Mabey Hire Instrumentation data website upon activation.

Below is a full list of solutions offered by the Mabey Hire Monitoring and Control team:

Environmental monitoring solutions

  • Vibration monitoring
  • Dust monitoring
  • Noise monitorin
  • BOUNDARY Guardian

Hired monitoring solutions

  • Universal data acquisition systems
  • Temperature monitoring
  • Displacement monitoring

Contract monitoring solutions

  • Full service monitoring
  • Geodetic monitoring
  • Geotechnic monitoring
  • Topographical monitoring
  • Advanced data analysis & display

Calibration and testing solutions

  • Load testing
  • Product testing
  • Optical instruments
  • Instrumentation testing

Mabey Hire has incorporated these systems on Highways Agency and Network Rail projects, including the Canning Town Flyover. The Mabey Hire Monitoring & Control team will be showcasing their capabilities at the Railtex exhibition at the NEC in Birmingham on 12th to 14th May 2015, and can be found at stand V91.

Leave a Reply

Latest news

AWMS
LIFTEX

Registration opens for LIFTEX 2025 (11 - 12 June)

Registration has opened for LIFTEX 2025. Now in its 37th year, the show is the UK’s only dedicated exhibition for the lift, escalator and access industry and takes place only once every three years.

Posted in Accessibility, Articles, Building Associations & Institutes, Building Industry Events, Building Industry News, Building Products & Structures, Building Regulations & Accreditations, Building Services, Exhibitions and Conferences, Facility Management & Building Services, Health & Safety, Restoration & Refurbishment, Retrofit & Renovation

Tobermore
Tobermore

Groundworkers - improve your tender success rates with Tobermore's Secura Portal

For groundworkers, tendering residential retaining wall projects can be a time-consuming and complicated process. The key is to tender using Tobermore’s Secura modular concrete block retaining walls rather than the default masonry specification & the Secura Portal, an online tool.

Posted in Articles, Bricks & Blocks, Building Industry News, Building Products & Structures, Building Services, Building Systems, Case Studies, Civil Engineering, Concrete, Cement, Admixtures, Facility Management & Building Services, Hard Landscaping & Walkways, Information Technology, Innovations & New Products, Landscaping, Posts, Restoration & Refurbishment, Retrofit & Renovation, Walls