With much anticipation, BSI launch BS8102:2022 Protection of below ground structures against water ingress. Code of practice. Delta Membranes has more…
BS8102:2009 is without doubt, a great Standard which has been enhanced with the launch of BS8102:2022. It should be noted that BS8102:2009 is now superseded and withdrawn.
There has been much speculation on BS8102:2022 and it has been right to fine-tune such a crucial document, ultimately BS8102:2022 has been developed as a cornerstone to reduce risk. Reducing risk is quite an open term and covers measures to reduce the frequency or severity of failure and includes fire protection, life cycle, safety, and design approaches.
Whilst only small changes, these changes reflect the widespread adoption of terms and definitions to ensure the avoidance of miscommunication.
‘Watertight’ has been replaced with ‘waterproof’ (impervious to free water).
‘Waterproofing admixtures’ should be referred to as ‘water resistant admixtures’. This amendment avoids any misconception that the admixture can solely be relied upon to provide a waterproofing system alone. It should be noted that water resistant admixtures reduce the capillary absorption of hardened concrete.
When referring to existing structures assessment of any ‘direct’ has been replaced with ‘actual’ or potential discontinuity. This amendment emphasises a wider scope for design considerations.
Bonded, becomes fully bonded, this new term covers compatibility, durability, and buildability, included within this umbrella is the prevention of lateral migration of water from a defect and resistance to negative hydrostatic head. Membranes should be fully bonded to prevent lateral migration of water from a defect, provide resistance to negative hydrostatic head and in all cases the level of bond is relevant to depth of use or water pressure.
Waterproofing products should no longer be termed as ‘certification’. Product information should include manufacturers data sheets, installation guides, accredited performance test data and any regulatory compliance data.
Materials should be used in accordance with the conditions and requirements set out in the relevant technical product information in accordance with the manufacturers recommendations by personnel trained in their use and application.
Schematics which illustrate Type A, B and C waterproofing have been updated.
Where continuity between Types A, B and C waterproofing are required, designers are required to verify full compatibility of systems.
Manufacturers should be consulted and able to produce performance data of a specific water resisting admixtures.
Those responsible for the overall waterproofing design should be identified at the planning stage or as early as possible. All decision made by others that might have impact on the waterproofing deign should be brought to the attention of the waterproofing specialist, design team and installing contractors.
Final decisions and any recommendations should be approved by those taking overall responsibility for the design of the waterproofing.
If RIBA stages are used, a waterproofing specialist should be appointment before the technical design stage at the latest.
Considerations for effects of climate change, burst water mains, flooding, etc should be included in all designs.
Waterproofing measures should be designed on the basis that during the life of the structure water might come against any part of the structure that is at or below ground level or is earth retaining. Waterproofing should therefore be continuous.
Where Ground Gas Protection is incorporated into the waterproofing design compatibility and continuity are key.
As with all elements of construction, workmanship and quality control are crucial in designing for success. A robust quality assurance process/integrity testing should always be carried out to avoid any potential mistakes.
To ensure waterproofing designs are durable and fit for purpose, correct detailing and implementation of penetrations are an important discipline. Whether pre- or post-construction these should be carefully detailed to minimise the risk of water ingress.
Continuity is crucial for successful construction and waterproofing. BS 8102:2022 places additional emphasis on good planning, correct sequencing and site management processes are in operation.
The BS 8102:2022 recognises advancement in technologies from its predecessor but emphasises the importance of transparency between manufacturer and installer in verifying compatibility between products.
Design approaches to basement drainage continue to be a key element.
Requirements for servicing and maintenance of basement drainage should be incorporated into the waterproofing design and upon completion be included in the Operation and Maintenance Manual (O&M).
Designers are required to include assessment of remedial treatment of their designs and included as a contingency measure.
Sustainability is one of the greatest challenges within the construction industry, regardless of what waterproofing system is utilised, designers should be mindful of minimising the embodied carbon over the whole life cycle of the structure when designing below ground structures.
Do you have questions about a project, product, or application? In an ever-changing industry where reduced risk and higher quality is required, you need a waterproofing design partner that is proactive and dedicated to help you keep up with new technologies and solutions to ensure your projects thrive.
Whatever the needs of your business, you can rely on the #DeltaTeam to ensure you get the right advice, support, and practical help at exactly the right time to keep you ahead of the competition.
Delta Membrane Systems,
Delta House,
Merlin Way,
North Weald,
Epping,
Essex,
CM16 6HR
United Kingdom
Visit Delta Membrane Systems' website
The latest Builders Merchant Building Index (BMBI) report shows builders’ merchants’ value sales in October were up +1.2% compared to the same month last year.
Posted in Articles, Bathrooms & Toilets, Bricks & Blocks, Building Associations & Institutes, Building Industry News, Building Products & Structures, Building Services, Building Systems, Civil Engineering, Cladding, Concrete, Cement, Admixtures, Drainage, Drainage Services, Floors, Garden, Hand Tools, Hard Landscaping & Walkways, Health & Safety, Heating Systems, Controls and Management, Heating, Ventilation and Air Conditioning - HVAC, Information Technology, Interior Design & Construction, Interiors, Landscaping, news, Paints, Paints, Coatings & Finishes, Pipes, Pipes & Fittings, Plant, Equipment and Hire, Plumbing, Power Tools, Publications, Research & Materials Testing, Restoration & Refurbishment, Retrofit & Renovation, Site Preparation, Sustainability & Energy Efficiency, Timber Buildings and Timber Products, Walls, Waste Management & RecyclingKids’ Village is delighted to have partnered with GEZE UK as their 2025 charity of the year – find out more via the article…
Posted in Access Control & Door Entry Systems, Architectural Ironmongery, Articles, Building Industry Events, Building Industry News, Building Products & Structures, Building Services, Charity work, Doors, Facility Management & Building Services, Health & Safety, Restoration & Refurbishment, Retrofit & Renovation, Security and Fire Protection, WindowsThe Encon Group, the leading independent distributor of building materials, is pleased to announce that it has been awarded Silver membership of The 5% Club by the 2024/25 Employer Audit Scheme.
Posted in Articles, Awards, Bricks & Blocks, Building Associations & Institutes, Building Industry Events, Building Industry News, Building Products & Structures, Building Regulations & Accreditations, Building Services, Building Systems, Civil Engineering, Cladding, Concrete, Cement, Admixtures, Facades, Hard Landscaping & Walkways, Health & Safety, Insulation, Landscaping, Plant, Equipment and Hire, Recruitment, Restoration & Refurbishment, Retrofit & Renovation, Site Preparation, Training, WallsLocated in Charlton, South London, SWA member West Leigh was established during the Blitz, in 1943. During the destruction in London, the company helped in repairing windows and facades that had been damaged by bombings throughout the city.
Posted in Articles, Building Associations & Institutes, Building Industry News, Building Products & Structures, Building Services, Building Systems, Case Studies, Facades, Glass, Glazing, Restoration & Refurbishment, Retrofit & Renovation, Steel and Structural Frames, Walls, Windows