Rob Speke, technical academy manager at Saint-Gobain Weber, offers advice on the dos and don’ts of preparing substrates and applying floor screeds.
The best way to prepare a substrate is to always remove dust first. You might need to grind or shotblast it depending on how poor the substrate is. For this, you’ll need a good brush and a hoover to remove dust.
Priming is crucial – the substrate will need to be primed at least twice. The recommendation is that you brush the primer in.
Some people don’t brush (they might use atomisers) but the problem with that is it doesn’t get into the pores of the substrate, which can create a lot of air bubbling. It can also reduce the flowability of any good screed.
You should prime the project the night before you plan on applying the screed, come in the next morning and give it a quick lick over again with the primer.
I’d advise using weberfloor 4716 primer, an acrylic floor primer for use with all cementitious and hemi-hydrate floor screeds. By the time you’ve set up your machine and prepped everything the primer will have soaked in sufficiently.
You shouldn’t really be leaving it longer than 36 hours. This is because you’re going to have problems with dust particles and people walking over the primed floor.
Regardless of if it’s a thin screed, like weberfloor smooth 4150, or a base screed, such as weberfloor fibre rapid 4320, there should be a 10mm soft foam barrier placed around all walls, pillars and columns.
Anywhere the screed meets another rigid object, there’ll be different expansions. This can cause hairline cracking – using a 10mm soft foam perimeter barrier can help stop this from happening.
Temperatures are critical too. The room you are screeding needs to be above 8°C but below 25 °C.
High humidity in a room means the screed won’t dry very quickly. Open up a window or a door slightly to help ventilate the room. You need some air change in the room but you don’t want them open so wide that you get a ripple effect on the screed.
Put a couple of used empty bags in the doorway to wipe your feet on once you’ve finished the room. If you don’t do this, you’ll end up walking screed all through the house, on the lawn and in your van.
A common mistake people make is that they get so excited about starting a job that they don’t prepare properly. One minute they are happily pumping floor screed and the next they’re stuck in a corner screaming for a bucket to put the hose in. Make sure you understand the geography of the building you’re working on.
Another mistake people tend to make is they’ll set up the machine to run, make the relevant checks and then think they never have to do another flow test. However, what they have to understand is that the machine will wear and tear slightly throughout the operation.
To ensure materials are mixed correctly, a flow ring measurement is essential both before and during a screed application.
A flow test should be carried out every tonne or 15 minutes, whichever comes first, for the first hour and then every 20 minutes if results are stable.
The most critical point of any screed installation is the last square metre. This is because it’s the last thing you do when you’re tired and trying to complete the job and leave. It’s also the first metre the customer sees.
It is the most important point of any floor because if your customer sees a terrible finish in that last metre they’re going to be very critical of the rest of the floor. If that’s in good order, then the chances are everything else will be.
For more information on Saint-Gobain Weber’s flooring systems, visit the website.
Click here to read a Saint-Gobain Weber guide that supports specifiers with the flooring process.
Saint-Gobain Weber
Dickens House, Enterprise Way
Maulden Road
Flitwick
Bedford
MK45 5BY
UK
Visit Saint-Gobain Weber's website
The latest Builders Merchant Building Index (BMBI) report shows builders’ merchants’ value sales in October were up +1.2% compared to the same month last year.
Posted in Articles, Bathrooms & Toilets, Bricks & Blocks, Building Associations & Institutes, Building Industry News, Building Products & Structures, Building Services, Building Systems, Civil Engineering, Cladding, Concrete, Cement, Admixtures, Drainage, Drainage Services, Floors, Garden, Hand Tools, Hard Landscaping & Walkways, Health & Safety, Heating Systems, Controls and Management, Heating, Ventilation and Air Conditioning - HVAC, Information Technology, Interior Design & Construction, Interiors, Landscaping, news, Paints, Paints, Coatings & Finishes, Pipes, Pipes & Fittings, Plant, Equipment and Hire, Plumbing, Power Tools, Publications, Research & Materials Testing, Restoration & Refurbishment, Retrofit & Renovation, Site Preparation, Sustainability & Energy Efficiency, Timber Buildings and Timber Products, Walls, Waste Management & RecyclingKids’ Village is delighted to have partnered with GEZE UK as their 2025 charity of the year – find out more via the article…
Posted in Access Control & Door Entry Systems, Architectural Ironmongery, Articles, Building Industry Events, Building Industry News, Building Products & Structures, Building Services, Charity work, Doors, Facility Management & Building Services, Health & Safety, Restoration & Refurbishment, Retrofit & Renovation, Security and Fire Protection, WindowsThe Encon Group, the leading independent distributor of building materials, is pleased to announce that it has been awarded Silver membership of The 5% Club by the 2024/25 Employer Audit Scheme.
Posted in Articles, Awards, Bricks & Blocks, Building Associations & Institutes, Building Industry Events, Building Industry News, Building Products & Structures, Building Regulations & Accreditations, Building Services, Building Systems, Civil Engineering, Cladding, Concrete, Cement, Admixtures, Facades, Hard Landscaping & Walkways, Health & Safety, Insulation, Landscaping, Plant, Equipment and Hire, Recruitment, Restoration & Refurbishment, Retrofit & Renovation, Site Preparation, Training, WallsLocated in Charlton, South London, SWA member West Leigh was established during the Blitz, in 1943. During the destruction in London, the company helped in repairing windows and facades that had been damaged by bombings throughout the city.
Posted in Articles, Building Associations & Institutes, Building Industry News, Building Products & Structures, Building Services, Building Systems, Case Studies, Facades, Glass, Glazing, Restoration & Refurbishment, Retrofit & Renovation, Steel and Structural Frames, Walls, Windows