Fforest Timber works with DuPont to apply membrane solution for new build

  • 28 Apr 2017

Fforest Timber agreed to work with DuPont to apply the very latest membrane solution from the Tyvek system of advanced products for a new build project.

Developers WDL Homes Ltd were also chosen to become early adopters of the advanced StructureGuard solution.

DuPont Tyvek new StructureGuard img 3

The three storey, two block stand-alone development in Aberdare, Wales, has a 981 square metre block and a 255 square metre block. Together they form a configuration with a pitched slate roof and an elegant facade in painted block work and render, with feature stone elements.

There was an eight week interval between installing the membrane-wrapped timber elements and applying the external skin, so optimum performance was vital – both to protect the timber engineering and to allow various trades to continue work until completion.

DuPont Tyvek new StructureGuard img 2

DuPont Tyvek StructureGuard has vapour diffusion, strong yet lightweight durability, plus superior water hold out (above W1 at 1500mm) and robust wind washing resistance. Being fully BBA certified, this version has been adapted to be ideal for larger scale commercial projects in exposed situations.

It is suitable for either off-site application (as in this case) or when quick and easy on-site installation is essential.

DuPont Tyvek new structureGuard img 4

Tyvek StructureGuard is compatible with all specialised tapes and sealants, creating a cocoon around a structure to both shield its insulation and enhance thermal efficiency and comfort once occupied.

Susan Brewer of Fforest Timber who worked closely with DuPont technical teams during this first UK installation for Tyvek StructureGuard says “We are very familiar with the ease and reliability of Tyvek and have always experienced great service and results, so we were more than happy to go with this new product for our project in Aberdare.”

DuPont Protection Solutions
BBSP1
Bristol & Bath Science Park
Dirac Crescent
Emersons Green
Bristol
BS16 7FR

Phone: 08444 068 722

Technical enquiries: [email protected]

Visit DuPont Tyvek's website

Leave a Reply

Latest news

Acoustic panelling from Troldtekt creates striking effect at 6 Embassy Gardens

Wood wool acoustic panelling with a black finish from Troldtekt has been specified throughout 6 Embassy Gardens at Nine Elms in London

Posted in Acoustics, Noise & Vibration Control, Articles, Ceilings, Posts

Passenger lifts from Stannah elevate safety and accessibility at Elizabeth Tower

Two lifts, designed and manufactured in the UK by Stannah now take pride of place as part of London’s Elizabeth Tower restoration project

Posted in Articles, Lifts, Posts, Restoration & Refurbishment, Retrofit & Renovation

Senior Architectural Systems appoints new major projects manager

Aluminium windows, doors and curtain wall solutions manufacturer, Senior Architectural Systems has appointed Mark Rossouw to the newly created role of major projects manager

Posted in Articles, Building Industry News, Doors, Posts, Recruitment, Windows

Aluminium architectural louvre products from Kingfisher now available on NBS Source

Kingfisher Louvres has made four of its most popular screening and single bank weather louvres available to specify via the NBS Source platform

Posted in Air Conditioning, Articles, Facades, Heating, Ventilation and Air Conditioning - HVAC, Posts, Ventilation