After existing drainage scheme failed to prevent extensive flooding in the area as recently as 2012/2013, Telford and Wrekin planners put a condition on the approval to provide a scheme to resolve the flooding issues.
Complex flow control chambers such as the one designed for Limekiln Lane are being used increasingly.
Consulting engineers Mouchel established an innovative solution based on Sustainable Drainage Systems (SuDS) principles. The system uses a configuration of three Hydro-Brake Optimum flow controls to optimise the existing back up storage volume and provide enhanced protection for the built up areas downstream.
The existing arrangement was that normal dry weather flow followed the stream course with an arrangement which allowed overflow into a dry swale. The overflow was then discharged into a bypass system of 1200 mm diameter pipes. However, the perched nature of the stream had resulted in long-term flooding when the banks were breached.
Mouchel were challenged to deliver a robust flood protection scheme using the maximum storage available within a specific area allocated on the site, which sits between a housing development and new school playing fields. The new drainage design also had to ensure that normal stream flows could continue downstream with no restriction in light flow conditions for ecology and amenity purposes.
The existing drainage scheme was failing to prevent flooding through a nearby recent housing development
Neil Scott, Principal Engineer for Mouchel, discussed why Hydro-Brake Optimum was specified for the scheme: As you get more flow at a lower head through the Hydro-Brake Optimum, less back up storage is required. So, the discharge from the basin could be carefully controlled to make the most of the storage capacity available.
The maximum stored volume of 6,700 m3 was the total amount which could be accommodated within the area and the maximum combined continuation flow was 1.75 m3 per second. The maximum depth of water which could be achieved on the site is 2.2 m.
With these parameters in mind, Mouchel decided to split the flow so that normal flow and flood flows activated separate flow controls installed in a concrete headwall structure to provide additional protection when required.
With the help of Hydro’s technical design support, we devised a headwall arrangement with one flow control unit providing the continuation flow discharging at a maximum of 584 l/s through a 900 mm pipe, and units two and three on the other side of the shallow weir wall activated during peak events.
The normal surface water intake is channelled through the continuation unit into the existing watercourse. When the flow overtops the shallow weir wall, Hydro-Brake Optimum units two and three come into operation before combining and discharging into the 1200 mm pipe into a previously redundant overflow culvert, brought into more effective use as part of the scheme.
With all units set at the same level the flow is always split 33/66 as soon as the water level overtops the weir level.
FIT Show, the UK’s leading event for the window, door, flat glass, hardware, and roofing industries, is excited to announce the launch of a brand new Marketplace feature at its upcoming 2025 event (Birmingham NEC, 29 April – 1 May).
Posted in Architectural Ironmongery, Articles, Building Industry Events, Building Industry News, Building Products & Structures, Doors, Exhibitions and Conferences, Glass, Glazing, Hand Tools, Innovations & New Products, Plant, Equipment and Hire, Power Tools, Restoration & Refurbishment, Retrofit & Renovation, Roofs, Seminars, Training, WindowsEJOT Colorfast fasteners have been used extensively in the construction of eight new high-specification warehousing and logistics buildings at the Urban 8 Logistics Park in King’s Norton, Birmingham.
Posted in Articles, Building Industry News, Building Products & Structures, Building Systems, Case Studies, Facades, Restoration & Refurbishment, Retrofit & Renovation, Roofs, WallsA detailed contract to restore an iconic Art Deco building in the heart of Birmingham’s Jewellery Quarter was carried out by Steel Window Association member, The Window Repair Company (Northwest) Limited.
Posted in Articles, Building Associations & Institutes, Building Industry News, Building Products & Structures, Building Systems, Case Studies, Glass, Glazing, Restoration & Refurbishment, Retrofit & Renovation, Steel and Structural Frames, Sustainability & Energy Efficiency, WindowsGilberts Blackpool is continuing to build on its reputation as a pioneer with the unveiling of ThermaAstute™ – the most extensive range of thermally sensitive diffusers in the market.
Posted in Air Conditioning, Articles, Building Industry News, Building Products & Structures, Building Services, Facility Management & Building Services, Heating, Ventilation and Air Conditioning - HVAC, Innovations & New Products, Restoration & Refurbishment, Retrofit & Renovation, Sustainability & Energy Efficiency