Geberit

Geberit is the Perfect Fit at Dublin’s Two Oaks Residential Development

  • 3 May 2023

Two Oaks is a housing development comprising 590 apartments and duplexes, along with leisure facilities and retail, in Knocklyon, Dublin.

The project started in October 2021 and will feature 480 build-to-rent dwellings and a further 110 for private sale. 

Tasked with installing the water and drainage systems for the 480 build-to-rent apartments, mechanical engineering firm Gaffney Mechanical sought a cost- and time-effective alternative to welded copper piping systems. The choice? The Geberit Mapress press fit system. 

Why Geberit?

Press fitting delivers a quick and tidy installation, which reduces labour and eliminates hot works on site in comparison to welding or soldering. Immediate supply of Geberit Mapress was available, ensuring Gaffney Mechanical chose Geberit Mapress over other press fitting solutions for approximately 7,000 metres of copper piping for the potable water system across the 480 properties. 

With Mapress, installers simply need to cut the pipe to size, deburr the inside and outside, mark the socket insertion depth on the pipe, push the pipe into the socket of the fitting, then press the joint and connecting pipe using the pressing tool. 

Geberit

Coloured pressing indicators on the fittings offer easy identification of the material and show any unpressed joints during the installation process. Mapress is available in a range of materials including carbon steel, copper, stainless steel, and CuNiFe, making it suitable for a wide range of applications. 

Around 700 metres of Geberit HDPE piping was also specified for the drainage system in the build-to-rent properties, using heat welding equipment to complete the majority of works, with electrofusion collars where required.

Delivering the solution

Eamonn McKeown, senior contracts manager at Gaffney Mechanical, says: “It was clear that Geberit’s Mapress system would deliver benefits for us on site and with immediate supply – plus the addition of HDPE piping from a single supplier – it was an easy decision for us to choose Geberit.

“The client benefits from a quicker and tidier installation, and we’re able to move onto the next property safe in the knowledge that the connection is reliable.

“The use of a hot plate welder provided us with the benefit to fabricate spools off site and also on benches on site within a quality-controlled environment. This ensured a quality weld every time and reduced the possibility of in situ leaks thus reducing re-works time.”

Geberit House
Edgehill Drive
Warwick
Warwickshire
CV34 6NH

Leave a Reply

Latest news

ASSA ABLOY

ASSA ABLOY EMEIA: Save valuable time and money with a seamless switch to programmable digital keys

In 2025, access management can be a whole lot easier. By making access part of their digital processes, businesses can put time-consuming key management and the cost of changing the locks firmly behind them. Making this switch is a lot easier than many people think, as ASSA ABLOY explains here…

Posted in Access Control & Door Entry Systems, Architectural Ironmongery, Articles, Building Industry News, Building Products & Structures, Building Services, Doors, Facility Management & Building Services, Health & Safety, Information Technology, Innovations & New Products, Retrofit & Renovation, Security and Fire Protection

Showersave
GEZE
Insight Data

Insight Data achieves ISO9001 recertification with zero non-conformities

Leading industry data specialist, Insight Data, has successfully achieved the prestigious recertification for ISO9001 with zero non-conformities for the fourth consecutive year.

Posted in Articles, Building Industry News, Building Regulations & Accreditations, Building Services, Information Technology, Research & Materials Testing