Graf UK

Graf UK launches free commissioning of wastewater treatment systems

  • 5 May 2023

Water management specialist Graf UK launches what is thought to be an industry first with free commissioning of its wastewater treatment systems.

The move, which involves substantial investment in people and processes, is a proactive approach to dealing with and resolving common challenges caused by poor or incorrect installation or the lack of or sub-standard commissioning, service and maintenance, as the German-engineered systems themselves are renowned for their reliability.

Commissioning should take under an hour, but many end users and specifiers are unaware it is as essential a requirement as gas and electricity services are legally required to be signed off by specialists.

Graf UK

One2Clean and Klaro

As well as the free commissioning on the One2Clean and Klaro plants, Graf UK is also offering a three-year warranty, extended from one year, on the technology of their systems when the purchaser takes up a service agreement with a member of Graf’s growing national network of accredited service providers.

David Stagg, Graf UK’s technical manager, says: “A large percentage of end users simply aren’t aware that commissioning is available and how important it is to the long-term wellbeing of their plant. We have therefore taken the unique step of offering free commissioning with all our One2Clean and Klaro treatment plants.”

He explains that while registration systems do not guarantee the quality of long-term service and maintenance and the protection of ground water from potential pollution, such systems exist in Wales and Scotland but not currently in England.

Historically, there were some agencies which registered and tracked treatment plants but when the General Binding Rules were introduced by the Environment Agency in 2015, it is understood all this ceased.

David adds: “We have seen a culture change, where more people are now doing their research and due diligence before purchasing a wastewater treatment plant, but we recognised that we needed to take on the responsibility ourselves and become the Watchdog for our own systems, to avoid any potential emotional impact on the homeowner and environmental damage that may be caused without such measures in place.”

Issues with non-commissioned wastewater treatment systems can include odours due to poor aeration, sub-standard operation in general due to poor installation and system set up, and compressor breakdowns. Commissioning a Graf UK wastewater treatment plant involves a 15-20 point check list and usually costs approximately £150-£300, possibly more, depending on location and notice period.

Leave a Reply

Latest news

BMBI
GEZE
Encon
SWA

SWA: A focus on Steel Window Association member West Leigh

Located in Charlton, South London, SWA member West Leigh was established during the Blitz, in 1943. During the destruction in London, the company helped in repairing windows and facades that had been damaged by bombings throughout the city.

Posted in Articles, Building Associations & Institutes, Building Industry News, Building Products & Structures, Building Services, Building Systems, Case Studies, Facades, Glass, Glazing, Restoration & Refurbishment, Retrofit & Renovation, Steel and Structural Frames, Walls, Windows