Granada

Granada Glazing: Delivering acoustic, thermal and privacy benefits at hospital stroke unit

  • 13 Aug 2021

Granada Glazing has treated Hallamshire hospital’s stroke unit in Sheffield with a bespoke secondary glazing solution that provides acoustic, thermal and privacy benefits for patients accessing the city centre facility.

Run by Sheffield Teaching Hospitals NHS Foundation Trust, the highly regarded hyper-acute stroke unit is situated at the multi-storey Royal Hallamshire Hospital, close to Sheffield city centre.

Phase one of the project saw secondary glazing specified to attenuate external noise and increase thermal insulation, improving the overall comfort levels for all patients. Privacy was also a major concern within the large 14-bed bays within Ward L1.

Working to locally based JTP Architects’ specification, Granada Glazing’s horizontal sliding secondary glazing units, finished in white, in two, three and four-panel configurations to line up with the primary windows, feature. Low-E glass enhances thermal performance and achieve a 1.9W/m2K centre pane U-value. 

Ensuring privacy and controlling the level of light entering the ward were also key requirements. Granada supplied integral venetian blinds, which were affixed to the secondary system, in the cavity between the primary and secondary glazing.

Granada

Protected on both sides by the primary window and secondary glazing, the blind is operated by a room-side thumb-turn mechanism routed through the timber subframe. The result is complete control of privacy and light without the need to open the secondary glazing.

Due to the success of phase one, Granada Glazing have been appointed to supply secondary glazing in Ward L2.

‘Look smart’

Lewis Black, of JTP Architects, comments: “It’s the first time we had worked with Granada Glazing and their assistance with the technical aspects went very well. The units are unobtrusive and look smart, just how we envisaged they would.

“For the new phase, we consulted Granada on an upgraded specification and between us devised an alternative system using hinged casements.”

Mike Latham of Granada Glazing’s Commercial Sales, comments: “Phase one (Ward L1) was a very successful project – both in terms of the performance and operation of the secondary glazing system – we are pleased to be engaged for the second phase (Ward L2). 

“In consultation with the architect, we agreed on an upgraded specification to our Heritage Hinged system to house sealed units within the secondary glazing providing enhanced insulation. This system also provides easy access for cleaning and maintenance.”

Granada Glazing partners with architects and specifiers on the design, manufacture and supply of high quality commercial secondary glazing for all sectors and building types, in the North West and across the UK.

Leave a Reply

Latest news

ASSA ABLOY

ASSA ABLOY EMEIA: Save valuable time and money with a seamless switch to programmable digital keys

In 2025, access management can be a whole lot easier. By making access part of their digital processes, businesses can put time-consuming key management and the cost of changing the locks firmly behind them. Making this switch is a lot easier than many people think, as ASSA ABLOY explains here…

Posted in Access Control & Door Entry Systems, Architectural Ironmongery, Articles, Building Industry News, Building Products & Structures, Building Services, Doors, Facility Management & Building Services, Health & Safety, Information Technology, Innovations & New Products, Retrofit & Renovation, Security and Fire Protection

Showersave
GEZE
Insight Data

Insight Data achieves ISO9001 recertification with zero non-conformities

Leading industry data specialist, Insight Data, has successfully achieved the prestigious recertification for ISO9001 with zero non-conformities for the fourth consecutive year.

Posted in Articles, Building Industry News, Building Regulations & Accreditations, Building Services, Information Technology, Research & Materials Testing