Preventing noise from disturbing nearby residents was a key planning requirement in the conversion of one of Shrewsbury’s most recognised historic buildings into the town’s first dedicated champagne bar and Granada Glazing has delivered.
The company’s secondary glazing was specified to reduce noise emissions from Ten & Six, which occupies a magnificent black and white Grade II* Listed Building on Mardol in the town centre.
Dating back several centuries, the building’s age and listed status presented some complex challenges – not least some very awkward-shaped windows.
Taking inspiration from Alice’s Adventures in Wonderland, the bar’s surreal theme complements the building’s characterful structure and interesting angles.
George Marneros, Ten & Six owner, commented on the renovation project, which had to satisfy stringent local authority and Historic England conditions.
“Nothing is level in the building, including the windows so they were a massive factor in how to treat the noise issues,” he said.
Because of the nature of our business, especially in the evenings, reducing noise from our customers was a primary concern.
“Changing the primary windows was not an option, so secondary glazing was the obvious solution to provide the necessary noise insulation.
“However, being a Grade II* listed building it was imperative to appease all the relevant parties and to preserve its significant character.”
Acoustic tests were conducted to measure noise levels and assess how much these could be reduced through a secondary glazing solution.
Granada Glazing’s technical team surveyed the site several times to advise on the style, function and installation of the secondary glazing to suit the building’s age, architectural needs and visibly sloping angles of the street-facing bay windows.
Horizontal Sliding and lift-out slimline aluminium frames in matt white and van dyke brown powder-coated finishes were installed over three days to the ground floor and first floor primary timber single-glazed windows by Granada’s installer partner C-Thru (Shropshire) Ltd.
Secondary glazing is an effective and efficient way to enhance a listed building’s thermal performance and to reduce noise, with the additional benefit of increased security.
For this project, the units needed to be removable for cleaning and lockable so that customers couldn’t open them during opening hours and let out noise.
Andy Fisher, C-Thru’s Sales Consultant, recalled some of the project’s challenges: “A critical design element was to ensure that from the outside there is no obvious secondary glazing in place; so, the mullions of the interior secondary glazing had to be exactly in line with those of the primary windows.”
As is often the case in ancient buildings, nothing is level, as Andy explained: “Skilled carpenters created the timber scribing that follows the sloping lines of some of the windows to support the secondary glazing frames.
“Upstairs, the secondary glazing to the front two bay windows had to be made on an angle to fit the shape of the primary windows.”
Commenting on the final result, George said: “These windows are at awkward angles and thanks toGranada Glazing and C-Thru, we overcame some significant challenges in a very old building. They did a great job. and the end result is fantastic.
“No one comes in and mentions the secondary glazing, which is serving its purpose. It’s exactly how you want it to be, it blends in and is virtually invisible!”
Granada Glazing works with architects and specifiers on the design, manufacture and supply of high quality commercial secondary glazing for all sectors and building types across the UK.
For more information on how we can assist with your project, please telephone 01909 499 899 or email: info@granadaglazing.com
A video of the project can be watched here
Contact:
Granada Glazing
Campbell Way
Dinnington
Sheffield
S25 3QD
Phone: 01909 499 899
Fax: 01909 499 900
Email: [email protected]
Twitter: @GranadaGlazing
Claire Hazelgrove, Member of Parliament for the Filton and Bradley Stoke constituency, visited Brabazon on 7 November to see firsthand the installation of innovative Ecodan heat pumps by Mitsubishi Electric.
Posted in Articles, Building Industry News, Building Products & Structures, Building Services, Case Studies, Facility Management & Building Services, Heating Systems, Controls and Management, Heating, Ventilation and Air Conditioning - HVAC, news, Pipes & Fittings, Plumbing, Retrofit & Renovation, Sustainability & Energy EfficiencyTwo Imax Xtra 2 240kW Ideal Heating Commercial condensing boilers have been installed at Hull Maritime Museum as part of a major restoration project to the Grade 2* listed building.
Posted in Articles, Building Industry News, Building Products & Structures, Building Services, Case Studies, Facility Management & Building Services, Heating Systems, Controls and Management, Heating, Ventilation and Air Conditioning - HVAC, Pipes & Fittings, Plumbing, Retrofit & Renovation, Sustainability & Energy EfficiencyIdeal Heating Commercial has released a new CIBSE approved CPD: Understanding refrigerants & how they affect the choice of commercial heat pumps.
Posted in Articles, Building Associations & Institutes, Building Industry Events, Building Industry News, Building Products & Structures, Building Services, Continuing Professional Development (CPD's), Facility Management & Building Services, Heating Systems, Controls and Management, Heating, Ventilation and Air Conditioning - HVAC, Innovations & New Products, Pipes & Fittings, Plumbing, Retrofit & Renovation, Seminars, TrainingHambleside Danelaw is proud to bring to market a new and updated Thin Leading Edge Interlocking Dry Fix Verge. Superseding the HD TIDV, the ThinVerg® is a result of ongoing product development based on customer demands.
Posted in Articles, Building Industry News, Building Products & Structures, Building Systems, Innovations & New Products, Posts, Restoration & Refurbishment, Retrofit & Renovation, Roofs