The construction industry has a poor health record. Each year in this sector, 3% of site personnel suffer from an illness they believe to be work-related. This number equates to 1.7 million working days lost every year to ill-health.
And whilst there have been big improvements in health and safety standards over the years, construction remains a high risk industry.
What are the main health-associated risks that constructions workers face?
The HSE state that “construction accounts for over 40% of occupational cancer deaths and cancer registrations.” With an estimated annual figure of 5,000 cases, approximately 3,700 of those result in death.
Asbestos is the Number One cause. Silica takes the Number Two spot. And painting and diesel fumes are Number Three.
Hazardous substances such as dust and chemicals are the cause of many serious diseases and chronic conditions that workers face.
Standard construction processes that release dust, fumes, vapors or gases into the air can cause irreparable damage to the lungs, brain, eyes and skin. More information about health hazards of dust inhaling can be found in this Dust Control Whitepaper.
And chronic conditions such as, dermatitis is on the rise with cases multiplying each year from not wearing the correct protective equipment.
Unsurprisingly back injury is common among construction workers, with the amount of manual labour involved and the lack of site checks to ensure that proper equipment and lifting processes are in place.
But perhaps surprisingly, construction has one of the highest rates of ill health caused by machinery noise and vibration.
So how can companies create a healthy environment for their construction workers and contractors?
There are four phases when doing this:
1 – Planning phase
What size is the site? Where is it? How many different contractors will be on site? Who has over-arching responsibility and how will this be managed?
2 – Identify the health hazards
What tasks will you or the worker be carrying out? Where will those tasks take place? What risks could be associated with each of those tasks? Will other people be affected by any of those tasks? If so, what could the risk be?
3 – Assess the risk
With each risk, assess the significance of it. How many people would be involved, the location and the likely outcome of damage?
4 – Involve personnel
Inform all site personnel of the risks associated with that specific site and job. Ask them to discuss preventative measures and to offer their ideas for reducing the risk to site personnel. This collaboration creates a team-like culture regardless of the number of different contractors and sub-contractors there are on site.
Once the risks have been identified, find ways to prevent or minimize them.
What solutions are there to reduce harmful substances from permeating the air? Is there adequate ventilation? Has the correct ventilation solutions & systems been provided? Is it tested and up-to-date?
And finally, ensure all site personnel are fully trained.
Don’t stop after the initial assessment and strategy. This is an ongoing process that should be monitored, reviewed and changed as needed to ensure the health and wellbeing of all site personnel.
It’s everyone’s responsibility.
Create a healthy environment for your site personnel today.
References:
1. Illness prevalence, Labour Force Survey annual average 2011/12, 2013/14, 2014/15
Author Bio:
Tim Dupont is a Marketing Director at RVT Group and has been with the company since 2007. Since joining the company Tim has been very involved with the sales department and for the last two years he has been spearheading the marketing department including the brand progression. Tim is experiencing a very exciting move forward and is very pleased to be part of a great team at RVT Group.
The new Jorge Chávez Airport in Peru is one of the most pioneering airport projects ever undertaken in South America – it features Gatic UltraSlot from Alumasc Water Management Solutions (AWMS).
Posted in Articles, Building Industry News, Building Products & Structures, Building Services, Case Studies, Civil Engineering, Concrete, Cement, Admixtures, Drainage, Drainage Services, Drainage, Guttering, Soffits & Fascias, Facility Management & Building Services, Hard Landscaping & Walkways, Landscaping, Pipes & Fittings, Plumbing, Posts, Restoration & Refurbishment, Retrofit & RenovationRegistration has opened for LIFTEX 2025. Now in its 37th year, the show is the UK’s only dedicated exhibition for the lift, escalator and access industry and takes place only once every three years.
Posted in Accessibility, Articles, Building Associations & Institutes, Building Industry Events, Building Industry News, Building Products & Structures, Building Regulations & Accreditations, Building Services, Exhibitions and Conferences, Facility Management & Building Services, Health & Safety, Restoration & Refurbishment, Retrofit & RenovationThanks to a Saniplus UP from Saniflo, a new garden retreat in the capital has been elevated to a new level of comfort and convenience.
Posted in Articles, Bathrooms & Toilets, Bathrooms, Bedrooms & Washrooms, Building Industry News, Building Products & Structures, Building Services, Case Studies, Drainage, Facility Management & Building Services, Garden, Interiors, Pipes & Fittings, Plumbing, Restoration & Refurbishment, Retrofit & RenovationFor groundworkers, tendering residential retaining wall projects can be a time-consuming and complicated process. The key is to tender using Tobermore’s Secura modular concrete block retaining walls rather than the default masonry specification & the Secura Portal, an online tool.
Posted in Articles, Bricks & Blocks, Building Industry News, Building Products & Structures, Building Services, Building Systems, Case Studies, Civil Engineering, Concrete, Cement, Admixtures, Facility Management & Building Services, Hard Landscaping & Walkways, Information Technology, Innovations & New Products, Landscaping, Posts, Restoration & Refurbishment, Retrofit & Renovation, Walls