The Building Safety Act came into force in England & Wales in April 2023, heralding a new era for construction in which safety, competence and accountability will have a far higher priority across the whole industry. However, it does not apply to all buildings and does not replace the need to comply with existing Building Regulations. Hush Acoustics has more…
A key fact to recognise about the new Act is that it initially only applies to residential Higher-Risk Buildings (HRBs). These are new or existing buildings which are occupied, over 18 metres high or seven storeys or more, and contain two or more residential units.
Care homes and hospitals built to the same height are also covered by the Act, due to the vulnerable nature of many people in these types of buildings. But hotels, secure residential institutions, such as prisons, and military premises (e.g., military barracks and buildings containing accommodation provided by the Ministry of Defence) are excluded from both parts of the new regime.
Whilst it is acknowledged that the Act will have implications right across the construction industry, from a compliance perspective it is important to understand that it does not fundamentally change the legislation applying to low rise buildings. And if your project is located in Scotland and Northern Ireland, the Act has only a very limited application.
For anyone working on acoustic walls and floors in buildings located in England & Wales below 18m in height, which includes the vast majority of houses and apartment buildings, the standards focus will continue to be Approved Document E. And, to comply with fire safety, designs must continue to meet the requirements of Approved Document B.
Providing acoustic designs meet the minimum standards set out for both of these Building Regulations, the separating wall or floor/ceiling will be approved. Nothing changes from that perspective.
Where you will need to work differently is for buildings that fall within the Building Safety Act’s realm – HRBs. The standards demanded by Approved Documents E and B will still need to be met, but there will also be a requirement to comply with the new processes designed to ensure buildings can be properly managed, maintained and refurbished throughout their lifetime.
Companies and individuals involved in the acoustic systems supply chain will need to provide all the information required to develop a ‘golden thread’ for each building – a building’s ‘single source of truth’ as the HSE describes it. This is vital to enable the HRB’s appointed ‘accountable person’ to register it with the new Building Safety Regulator – a legal requirement.
Here, it will be necessary to provide information such as which materials have been used in an acoustic wall or floor/ceiling, evidence of how it complies with the Building Regulations and who was involved in the manufacture, supply, installation and completion checks.
Given these changes in the construction process, along with a heightened awareness right across the industry to avoid doing anything that could compromise fire safety, it is unsurprising that Hush is receiving a large number of enquiries from architects, developers and contractors keen to ensure that acoustic walls, floors and ceilings will comply with the new HRB requirements.
The key to compliance is to seek specialist advice early in the process and consult with a fire engineering consultant if you are at all uncertain.
As acoustic design and manufacturing experts with over 30 years’ experience in delivering Building Regulations compliant solutions, Hush is also ideally placed to advise on the right sound reduction approach in HRBs.
The company already offers a diverse range of fully tested acoustic systems, many of which will comfortably deliver a good level of fire resistance in walls and floors, providing they have been installed in accordance with its guidelines, as well as numerous high quality sound insulation products.
For advice and to see Hush’s range, visit www.hushacoustics.co.uk.
Hush Acoustics Ltd
Unit 2, Tinsley Industrial Estate
Shepcote Way
Sheffield
South Yorkshire
S9 1TH
Tel: 0114 551 8685
Fax: 0151 944 1146
English Spirit Distillery has used an extensive package of Altro products front and back of house, in their new visitor centre café, shop and viewing area for the working distillery.
Posted in Articles, Bathrooms, Bedrooms & Washrooms, Building Industry News, Building Products & Structures, Building Systems, Case Studies, Floors, Interior Design & Construction, Interiors, Kitchens, Restoration & Refurbishment, Retrofit & Renovation, Timber Buildings and Timber Products, WallsAbloy UK has supplied The Safety Letterbox Company Ltd with a bespoke Sentry CL811 Camlock for use in its Secure Information Boxes, assisting life safety and complying with new regulations and legislation for high rise buildings.
Posted in Access Control & Door Entry Systems, Architectural Ironmongery, Articles, Building Industry News, Building Products & Structures, Building Regulations & Accreditations, Building Services, Case Studies, Facility Management & Building Services, Health & Safety, Posts, Restoration & Refurbishment, Retrofit & Renovation, Security and Fire ProtectionSituated at the northern edge of a newly developed retail park near Bristol, the Abbey Wood Travelodge was conceived as part of the company’s new Budget-Luxe line of hotels – it features CUPACLAD, from CUPA PIZARRAS.
Posted in Articles, Building Industry News, Building Products & Structures, Building Systems, Case Studies, Cladding, Concrete, Cement, Admixtures, Facades, Posts, Restoration & Refurbishment, Retrofit & Renovation, WallsOrigin’s latest investment is set to redefine industry standards as it launches its own in-house powder coating facility.
Posted in Aluminium Products, Articles, Building Industry News, Building Products & Structures, Building Systems, Doors, Glass, Glazing, Innovations & New Products, Paints, Coatings & Finishes, Restoration & Refurbishment, Retrofit & Renovation, Site Preparation, Windows