REHAU

Installation time plunges thanks to new REHAU plumbing station

  • 11 Dec 2019

Answering the demands of contractors to reduce installation time, REHAU has launched a range of new plumbing stations; pre-fabricated and pressure-tested single components for making sanitary connections that are millimetre accurate.

By providing such a connection in one single component, the plumbing station speeds up and simplifies installations.

For example, by using the plumbing station, three sinks could be installed in the time it would usually take for one, with no compromise on thermal insulation, sound insulation or condensation protection.

Installers are often faced with many differing installation scenarios, carefully and accurately fitting pipework into surface- or flush-mounted, T-piece or loop-though installations.

Suitable with any of these installation types, the plumbing station offers significant time savings, on top of reliability for contractors and specifiers.

The plumbing station is available for a number of different applications from wash basins to baths to branded concealed shower units such as Hansgrohe.

All designed with the installer in mind to make the job quicker, easier and less expensive than traditional methods – while delivering the quality assurance that RAUTITAN is known for.   

Contractors can testify that intricate plumbing systems within building projects require a multitude of different fittings and components, each of which take time and patience to install.

Given it is a single component, the plumbing station removes the need for hundreds of components, allowing installers to meet their tighter deadlines.

Drew Clough, Product Manager for Heating and Plumbing at REHAU UK, commented: “Contractors need solutions that make installing plumbing systems as quick as possible.

“With REHAU’s new plumbing station, installers can have a simple-to-install, one-component solution that speeds the installation process along dramatically.

“This one-size-fits-all component is a universal fitting that can be used for every type of installation imaginable. The need for large numbers of components is now a thing of the past.”

Contact:

REHAU
Hill Court,
Walford,
Ross on Wye,
Herefordshire,
HR9 5QN

Email address: [email protected]
Tel: 01989 72600

Visit REHAU's website

Leave a Reply

Latest news

ASSA ABLOY

ASSA ABLOY EMEIA: Save valuable time and money with a seamless switch to programmable digital keys

In 2025, access management can be a whole lot easier. By making access part of their digital processes, businesses can put time-consuming key management and the cost of changing the locks firmly behind them. Making this switch is a lot easier than many people think, as ASSA ABLOY explains here…

Posted in Access Control & Door Entry Systems, Architectural Ironmongery, Articles, Building Industry News, Building Products & Structures, Building Services, Doors, Facility Management & Building Services, Health & Safety, Information Technology, Innovations & New Products, Retrofit & Renovation, Security and Fire Protection

Showersave
GEZE
Insight Data

Insight Data achieves ISO9001 recertification with zero non-conformities

Leading industry data specialist, Insight Data, has successfully achieved the prestigious recertification for ISO9001 with zero non-conformities for the fourth consecutive year.

Posted in Articles, Building Industry News, Building Regulations & Accreditations, Building Services, Information Technology, Research & Materials Testing