Wade HCE drainage channels were recently specified to efficiently manage water drainage at Lambeth Palace Garden Museum.
The sensitive refurbishment was completed in two halves over several years, 2008’s Phase I of the Museum’s update addressed the pressing need for dedicated spaces within the existing building. A little while later, 2013’s Phase II brought the opportunity for the museum to recreate its public face. This was achieved with an extension that aimed to break down the divide between the indoor and exterior spaces.
Housed in a church building adjacent to Lambeth Palace, the museum is often mistaken for part of the palace. The new extension consisted of a cluster of copper-clad pavilions that form a cloister garden. It was designed and built by Dow Jones Architects and provided a much-needed urban presence and updated identity for the whole building.
As a listed site, a water management system was needed that would be both functional and respect the parameters defined by its status. In collaboration with Dow Jones Architects, Alumasc WMS was able to design a bespoke version of the Wade HCE drainage channel that would stop water ingress from the garden area outside into the café, without distracting from the overall opulence of the building and the enchanting, secluded atmosphere of the garden.
Wade has an insurmountable reputation for quality and consistency. The 19.9m hidden threshold channel drain installed, now helps protect the listed building ponding rainwater in the garden and café.
Installed by contractors JJ Coughlan LTD, Wade linear drainage channels and gratings have third party certification of conformance to BS EN 1433 and are supplied with marking to demonstrate this, plus a CE mark, giving every client peace of mind.
The landscape design at the museum was developed by Dow Jones in collaboration with Dan Pearson, with a view to exploring the relationship between the precision of the new and the patina of the old. Combined with the colour and texture of the planting, the design brings definition to the setting.
As a significant archaeological site with listed tombs, protected trees and protected views, the development of this museum site brought many challenges. Crucially, the architectural intervention in the church is reversible but still brings life and activity into the listed building. The overall scheme responds to the strict parameters in place whilst creating a building that now has an iconic presence in the city.
Alumasc Water Management Solutions
Station Road
Kettering
Northants
NN15 5JP
United Kingdom
Phone: 01536 383810
Fax: 01744 648401
Visit Alumasc Water Management Solutions website
Claire Hazelgrove, Member of Parliament for the Filton and Bradley Stoke constituency, visited Brabazon on 7 November to see firsthand the installation of innovative Ecodan heat pumps by Mitsubishi Electric.
Posted in Articles, Building Industry News, Building Products & Structures, Building Services, Case Studies, Facility Management & Building Services, Heating Systems, Controls and Management, Heating, Ventilation and Air Conditioning - HVAC, news, Pipes & Fittings, Plumbing, Retrofit & Renovation, Sustainability & Energy EfficiencyTwo Imax Xtra 2 240kW Ideal Heating Commercial condensing boilers have been installed at Hull Maritime Museum as part of a major restoration project to the Grade 2* listed building.
Posted in Articles, Building Industry News, Building Products & Structures, Building Services, Case Studies, Facility Management & Building Services, Heating Systems, Controls and Management, Heating, Ventilation and Air Conditioning - HVAC, Pipes & Fittings, Plumbing, Retrofit & Renovation, Sustainability & Energy EfficiencyIdeal Heating Commercial has released a new CIBSE approved CPD: Understanding refrigerants & how they affect the choice of commercial heat pumps.
Posted in Articles, Building Associations & Institutes, Building Industry Events, Building Industry News, Building Products & Structures, Building Services, Continuing Professional Development (CPD's), Facility Management & Building Services, Heating Systems, Controls and Management, Heating, Ventilation and Air Conditioning - HVAC, Innovations & New Products, Pipes & Fittings, Plumbing, Retrofit & Renovation, Seminars, TrainingHambleside Danelaw is proud to bring to market a new and updated Thin Leading Edge Interlocking Dry Fix Verge. Superseding the HD TIDV, the ThinVerg® is a result of ongoing product development based on customer demands.
Posted in Articles, Building Industry News, Building Products & Structures, Building Systems, Innovations & New Products, Posts, Restoration & Refurbishment, Retrofit & Renovation, Roofs