The Lafayette, a musician-friendly club in the heart of Kings Cross, now features a Saniflo Sanicubic, recommended by Surrey-based PumpServ.
The club opened its doors in early 2020 before being swiftly closed due to lockdown. After successfully re-opening a year later, it has become well-known on the UK music scene hosting hundreds of music shows and performances from household name bands.
When the 600-capacity venue was refurbished, a kitchen was installed in the basement and WCs a floor above, along with a cleaner’s cupboard. All waste water from these areas was previously drained into a bespoke pumping system in the corner of the pot wash area, which then pumped the waste up to ground level and away to the main drain.
A soil inlet that was slightly submerged into the lower section of the chamber was preventing waste water from completely draining into the pit, whilst a 100mm inlet pipe was too close to one of the submersible pumps in the pit preventing it from eliminating all paper waste. This caused clogging, blockages and became a general inconvenience to an otherwise excellent venue.
PumpServ, a national pump solutions maintenance company, was approached to evaluate the issue and suggest a solution. One option was to lower the chamber floor, but this would involve breaking out the concrete oversite. With concerns about the proximity of the Regent Canal and potential ground water ingress, PumpServ offered an alternative solution which would require the existing pumps to be swapped out. After a call to the technical team at Saniflo and a subsequent site inspection, the floor-standing Sanicubic 2 Pro lifting station was recommended for the job.
David Knight, Business Development Manager for PumpServ, comments: “The Saniflo Sanicubic Pro 2 has taken away the headache of blocked facilities for the Lafayette nightclub. Incoming pipework from the WC and shower in the Green Room and the small kitchen was too low at the point of entry to the pump station.
“The position of the two submersible pumps was restricting black waste and paper waste flow and these were building up at the point of entry. Occasionally the inflow would surcharge back to the kitchen floor drains causing a flood.
“With twin pumps – for failsafe operation –the sealed unit simply slotted into the space without any need for civils work and has eliminated the risk of overflow. The 110mm inlets, positioned at 140mm (floor height to centre of inlet), enabled a better fall for the swift discharge of incoming waste.”
The Saniflo commercial range has been designed for practical situations where waste needs to be lifted away safely and efficiently and the installation of this Sanicubic 2 Pro in the Lafayette nightclub illustrates perfectly the use for a Saniflo lifting station.
The latest Builders Merchant Building Index (BMBI) report shows builders’ merchants’ value sales in October were up +1.2% compared to the same month last year.
Posted in Articles, Bathrooms & Toilets, Bricks & Blocks, Building Associations & Institutes, Building Industry News, Building Products & Structures, Building Services, Building Systems, Civil Engineering, Cladding, Concrete, Cement, Admixtures, Drainage, Drainage Services, Floors, Garden, Hand Tools, Hard Landscaping & Walkways, Health & Safety, Heating Systems, Controls and Management, Heating, Ventilation and Air Conditioning - HVAC, Information Technology, Interior Design & Construction, Interiors, Landscaping, news, Paints, Paints, Coatings & Finishes, Pipes, Pipes & Fittings, Plant, Equipment and Hire, Plumbing, Power Tools, Publications, Research & Materials Testing, Restoration & Refurbishment, Retrofit & Renovation, Site Preparation, Sustainability & Energy Efficiency, Timber Buildings and Timber Products, Walls, Waste Management & RecyclingKids’ Village is delighted to have partnered with GEZE UK as their 2025 charity of the year – find out more via the article…
Posted in Access Control & Door Entry Systems, Architectural Ironmongery, Articles, Building Industry Events, Building Industry News, Building Products & Structures, Building Services, Charity work, Doors, Facility Management & Building Services, Health & Safety, Restoration & Refurbishment, Retrofit & Renovation, Security and Fire Protection, WindowsThe Encon Group, the leading independent distributor of building materials, is pleased to announce that it has been awarded Silver membership of The 5% Club by the 2024/25 Employer Audit Scheme.
Posted in Articles, Awards, Bricks & Blocks, Building Associations & Institutes, Building Industry Events, Building Industry News, Building Products & Structures, Building Regulations & Accreditations, Building Services, Building Systems, Civil Engineering, Cladding, Concrete, Cement, Admixtures, Facades, Hard Landscaping & Walkways, Health & Safety, Insulation, Landscaping, Plant, Equipment and Hire, Recruitment, Restoration & Refurbishment, Retrofit & Renovation, Site Preparation, Training, WallsLocated in Charlton, South London, SWA member West Leigh was established during the Blitz, in 1943. During the destruction in London, the company helped in repairing windows and facades that had been damaged by bombings throughout the city.
Posted in Articles, Building Associations & Institutes, Building Industry News, Building Products & Structures, Building Services, Building Systems, Case Studies, Facades, Glass, Glazing, Restoration & Refurbishment, Retrofit & Renovation, Steel and Structural Frames, Walls, Windows