Modular lockcases reduce maintenance costs and minimise disruption

  • 21 Jan 2014

The Optimus3 range can be used on 30 and 60-minute fore doors, whilst the split spindle accompanying the escape lock makes an emergency exit route possible when used with the 1000 series lever furniture.

Leave a Reply

Latest news

BMBI
GEZE
Encon
SWA

SWA: A focus on Steel Window Association member West Leigh

Located in Charlton, South London, SWA member West Leigh was established during the Blitz, in 1943. During the destruction in London, the company helped in repairing windows and facades that had been damaged by bombings throughout the city.

Posted in Articles, Building Associations & Institutes, Building Industry News, Building Products & Structures, Building Services, Building Systems, Case Studies, Facades, Glass, Glazing, Restoration & Refurbishment, Retrofit & Renovation, Steel and Structural Frames, Walls, Windows