The 2018 Building (Amendment) Regulations and two subsequent government advice notes regarding combustible materials on building exteriors have given rise to wave of refurbishment projects, as local authorities and private building owners respond to pressures to follow safety guidelines. It has prompted a surge of demand for replacement materials and systems that enable fast installation with minimal disruption to building occupants, as Neaco discuss here…
The 2018 legislation prohibits combustible materials on newly-built residential buildings with floors above 18m, but the government advice notes of 2019 and 2020 recommend the immediate removal of such materials from all existing buildings, regardless of floor height.
This advice has widespread implications for multi-storey apartment buildings, especially in relation to the often complex process of replacing potentially unsafe balconies.
Removing and replacing balcony materials, such as decking and balustrade, can be incredibly disruptive to existing residents. Noise, dust and light pollution from construction work can have a widespread effect on those around it.
In certain cases, access to homes could be blocked, requiring temporary accommodation which not only involves major inconvenience for residents, but also significant cost to local authorities and building owners.
Modular products have another invaluable advantage in the context of these refurbishment projects; suppliers with technical expertise can design and manufacture systems that offer ready-made, certified compliance with the regulations and guidelines introduced since 2018.
At Neaco, we manufacture aluminium balcony decking, balustrades and full balcony solutions which are Fire Rated and meet all requirements, both legal and advisory.
Flooring material is the element which most commonly needs replacing – many balconies on existing buildings still include traditional timber decking – and our aluminium systems offer an A1 or A2 Fire Rating which meets the standards set out in the 2018 Building (Amendment) Regulations.
Offering instant compliance has provided peace of mind to many local authorities and building owners seeking a straightforward solution to their refurbishment needs. With an incentive to act fast, they value suppliers that can deliver end-to-end with equal speed.
The latest Builders Merchant Building Index (BMBI) report shows builders’ merchants’ value sales in October were up +1.2% compared to the same month last year.
Posted in Articles, Bathrooms & Toilets, Bricks & Blocks, Building Associations & Institutes, Building Industry News, Building Products & Structures, Building Services, Building Systems, Civil Engineering, Cladding, Concrete, Cement, Admixtures, Drainage, Drainage Services, Floors, Garden, Hand Tools, Hard Landscaping & Walkways, Health & Safety, Heating Systems, Controls and Management, Heating, Ventilation and Air Conditioning - HVAC, Information Technology, Interior Design & Construction, Interiors, Landscaping, news, Paints, Paints, Coatings & Finishes, Pipes, Pipes & Fittings, Plant, Equipment and Hire, Plumbing, Power Tools, Publications, Research & Materials Testing, Restoration & Refurbishment, Retrofit & Renovation, Site Preparation, Sustainability & Energy Efficiency, Timber Buildings and Timber Products, Walls, Waste Management & RecyclingKids’ Village is delighted to have partnered with GEZE UK as their 2025 charity of the year – find out more via the article…
Posted in Access Control & Door Entry Systems, Architectural Ironmongery, Articles, Building Industry Events, Building Industry News, Building Products & Structures, Building Services, Charity work, Doors, Facility Management & Building Services, Health & Safety, Restoration & Refurbishment, Retrofit & Renovation, Security and Fire Protection, WindowsThe Encon Group, the leading independent distributor of building materials, is pleased to announce that it has been awarded Silver membership of The 5% Club by the 2024/25 Employer Audit Scheme.
Posted in Articles, Awards, Bricks & Blocks, Building Associations & Institutes, Building Industry Events, Building Industry News, Building Products & Structures, Building Regulations & Accreditations, Building Services, Building Systems, Civil Engineering, Cladding, Concrete, Cement, Admixtures, Facades, Hard Landscaping & Walkways, Health & Safety, Insulation, Landscaping, Plant, Equipment and Hire, Recruitment, Restoration & Refurbishment, Retrofit & Renovation, Site Preparation, Training, WallsLocated in Charlton, South London, SWA member West Leigh was established during the Blitz, in 1943. During the destruction in London, the company helped in repairing windows and facades that had been damaged by bombings throughout the city.
Posted in Articles, Building Associations & Institutes, Building Industry News, Building Products & Structures, Building Services, Building Systems, Case Studies, Facades, Glass, Glazing, Restoration & Refurbishment, Retrofit & Renovation, Steel and Structural Frames, Walls, Windows