Armstrong TLS

New TLS Prelude suspension system offers 20% faster installation

  • 2 Jun 2017

Armstrong Ceiling Solutions has launched a new engineered suspension system that is up to 20 per cent faster to install than standard systems. 

The new TLS Prelude 24mm metal hook cross tees are manufactured from solid steel and engineered with total precision. Ideal for commercial applications, the TLS is characterised by three key elements: 

  • Secure hook design
  • Ceiling stability and self squaring
  • Pre-shaped steel clip, for more secure connections that lock into place.

The Prelude 24mm TLS’s ergonomic design ensures a faster installation and dismount from the universal main runner. 

The system lies flush to the main runner to give a streamlined aesthetic, and features pre-shaped embossments on the clip to increase rigidity and control rotation. 

The Prelude TLS cross tees enable Armstrong to deliver a fire resistant and fully Cradle To Cradle certified system when installed with Cradle To Cradle certified ceilings such as Ultima+, Perla and Dune Supreme.

Grid-Off

The TLS system was introduced through the Grid-Off competition, organised by Armstrong, for its national network of Omega installers.

Teams of two from each contractor went head to head with another pair of fitters in a contest to install the TLS grid and Ultima+ board tile system in a 7.2m2 rig erected in a “boxing ring” at the NEC.

Feedback from the competition was positive, with the winners, Kevin Coyle and Tom Goodfellow from Omagh-based Omega contractor Coyle Suspended Ceilings describing the system was “first class” and “very easy to use”.

Contact:

Armstrong World Industries Limited
Harman House,
2nd Floor,
1 George Street,
Uxbridge UB8 1QQ
0800 371849

email: [email protected]  

Visit Armstrong Ceiling's website

Leave a Reply

Latest news

Mitsubishi Electric

Filton and Bradley Stoke MP visits Mitsubishi Electric installation

Claire Hazelgrove, Member of Parliament for the Filton and Bradley Stoke constituency, visited Brabazon on 7 November to see firsthand the installation of innovative Ecodan heat pumps by Mitsubishi Electric.

Posted in Articles, Building Industry News, Building Products & Structures, Building Services, Case Studies, Facility Management & Building Services, Heating Systems, Controls and Management, Heating, Ventilation and Air Conditioning - HVAC, news, Pipes & Fittings, Plumbing, Retrofit & Renovation, Sustainability & Energy Efficiency

Ideal Heating
Ideal Heating
Hambleside Danelaw

Hambleside Danelaw: ThinVerg® Dry Fix Verge

Hambleside Danelaw is proud to bring to market a new and updated Thin Leading Edge Interlocking Dry Fix Verge. Superseding the HD TIDV, the ThinVerg® is a result of ongoing product development based on customer demands.

Posted in Articles, Building Industry News, Building Products & Structures, Building Systems, Innovations & New Products, Posts, Restoration & Refurbishment, Retrofit & Renovation, Roofs