Triton has introduced the Cemflex VB Steel Waterbar that is fully weatherproof BBA certified and doesn’t need to be protected from rain prior to the concrete pour.

It addresses a key challenge in below ground basement construction for installers of quality ICF systems and pre-cast concrete twin wall systems, who need to create a good watertight seal between the ICF blocks or the twin wall panels and the basement slab.

Traditional hydrophilic waterstops have been around for many years and can be used successfully in most applications but when the blocks forming the structure are not in-filled with concrete for some time, and the waterstop is exposed to rain within the open blocks, it will start swelling prematurely and result in subsequent underperformance in an extremely vital location.

Attempting to remedy this by the removal of the waterstop is usually impossible because of its location inside the ICF blocks or twin wall panels.

BBA certified Cemflex VB Steel Waterbar is a galvanised steel plate encapsulated in a special patented coating that reacts only with the water within the concrete to provide a watertight joint.

It’s designed for use in all non-movement construction joints in reinforced concrete – and is especially suited to ICF or twin wall installations.

Quick and easy to install with no sticky tape to remove prior to use, it can be installed before the concrete is poured by positioning to steelwork, or directly into the fresh concrete after pouring.

Cemflex VB Steel Waterbar is 1.25mm thick and supplied in two metre lengths, in a choice of 100mm or 150mm widths.

Triton Systems,
Unit 3 – 5 Crayford Commercial Centre,
Crayford,
Kent,
United Kingdom,
DA1 4HF

Phone: 01322 318830
Fax: 01322 524017

Visit the Triton Systems website

Leave a Reply

Latest news

BMBI
GEZE
Encon
SWA

SWA: A focus on Steel Window Association member West Leigh

Located in Charlton, South London, SWA member West Leigh was established during the Blitz, in 1943. During the destruction in London, the company helped in repairing windows and facades that had been damaged by bombings throughout the city.

Posted in Articles, Building Associations & Institutes, Building Industry News, Building Products & Structures, Building Services, Building Systems, Case Studies, Facades, Glass, Glazing, Restoration & Refurbishment, Retrofit & Renovation, Steel and Structural Frames, Walls, Windows