Mabey Hire has opened a new depot at Iver. In close proximity to Heathrow Airport and the M4, the new facility has been built to expand the company’s network and improve its service capability.
By complementing Mabey Hire’s existing depots in Strood and Hatfield, the new facility will support the company’s contribution to the London region.
As the overall construction output in London has grown in recent months, Mabey Hire hopes its new facility will allow it to expand its reach into the area.
The site, based in Buckinghamshire, was chosen for its transport links into and out of the capital city. Less than 4 miles from the M4, it is ideally located for Mabey Hire to serve its existing and potential new customers.
The company, which provides non-mechanical plant hire and engineered modular and proprietary temporary works equipment, has recruited a specialist team to operate the new facility; they will be working closely with the Hatfield depot.
The Iver depot will be stocked with a range of equipment from Mabey Hire’s product catalogue, which has been selected from customer and industry feedback.
The depot will be unveiled at an Open Day, which is scheduled to take place on 5th November.
The event will showcase the capabilities of the new facility, making use of live product demos of Mabey Hire’s Hire’s Pipelifter and Manhole Ring Lifter
It will also present the media, customers and partners with the opportunity to meet the specialist team.
FIT Show, the UK’s leading event for the window, door, flat glass, hardware, and roofing industries, is excited to announce the launch of a brand new Marketplace feature at its upcoming 2025 event (Birmingham NEC, 29 April – 1 May).
Posted in Architectural Ironmongery, Articles, Building Industry Events, Building Industry News, Building Products & Structures, Doors, Exhibitions and Conferences, Glass, Glazing, Hand Tools, Innovations & New Products, Plant, Equipment and Hire, Power Tools, Restoration & Refurbishment, Retrofit & Renovation, Roofs, Seminars, Training, WindowsEJOT Colorfast fasteners have been used extensively in the construction of eight new high-specification warehousing and logistics buildings at the Urban 8 Logistics Park in King’s Norton, Birmingham.
Posted in Articles, Building Industry News, Building Products & Structures, Building Systems, Case Studies, Facades, Restoration & Refurbishment, Retrofit & Renovation, Roofs, WallsA detailed contract to restore an iconic Art Deco building in the heart of Birmingham’s Jewellery Quarter was carried out by Steel Window Association member, The Window Repair Company (Northwest) Limited.
Posted in Articles, Building Associations & Institutes, Building Industry News, Building Products & Structures, Building Systems, Case Studies, Glass, Glazing, Restoration & Refurbishment, Retrofit & Renovation, Steel and Structural Frames, Sustainability & Energy Efficiency, WindowsGilberts Blackpool is continuing to build on its reputation as a pioneer with the unveiling of ThermaAstute™ – the most extensive range of thermally sensitive diffusers in the market.
Posted in Air Conditioning, Articles, Building Industry News, Building Products & Structures, Building Services, Facility Management & Building Services, Heating, Ventilation and Air Conditioning - HVAC, Innovations & New Products, Restoration & Refurbishment, Retrofit & Renovation, Sustainability & Energy Efficiency