Novus efficiency gains during University of Manchester contract

  • 25 Aug 2015

Novus Property Solutions at University of Manchester

Planned and reactive maintenance

Novus’ contract covers planned and reactive maintenance for the entire campus – including historic listed buildings, high-tech science blocks and lecture theatres, as well as cafes and student accommodation.

  • 700 to 900 reactive orders alone carried out each month

New on-site stores manager role

The new on-site stores manager role has revolutionised the day-to-day management of the contract and improved overall efficiency significantly.

Stores manager, Steven Axon, is responsible for keeping stock at a level to meet demand, which in turn cuts down the risk of expensive over-ordering.

Operatives are able to order supplies using their PDAs while they’re on site and other bespoke items can also be ordered almost instantaneously which speeds up the whole process, reducing the time spent waiting for supplies to be delivered.  

First-time fixes up by 11%

As a result, the number of first-time fixes has increased by 11% to date, which not only represents a cost saving but also minimises disruption to end users. The stores manager also ensures that all materials used on both reactive and planned projects are of the highest quality and provide value for money.

Duncan Turner, maintenance services manager at the University of Manchester: “The long-term relationship the University has with Novus strengthens year-on-year. Our expectations are consistently exceeded by the Novus team and they assure us that the University’s facilities are in capable hands. The new stores manager has had a big impact on the service of day-to-day maintenance, which makes response much quicker while also helping to reduce our environmental impact by removing the risk of over-ordering and preventing frequent deliveries to site.”

Paul Fox, contracts manager at Novus: “Establishing the role has been very beneficial for the client and for our own team too. We’re able to save time thanks to materials being sourced by the manager to the exact specifications required for each job, reducing the time spent cutting materials down to size on site.”

Novus Property Solutions,
PO Box 3279,
Galveston Grove,
Oldfield Industrial Estate,
Fenton,
Stoke-on-Trent,
Staffordshire,
ST4 3PE

Phone: 01782 598000
Fax: 01782 598101

Visit Novus Property Solutions' website

Leave a Reply

Latest news

Reynaers

Reynaers broadens Vision 7 functionality with new panic hardware

Reynaers Aluminium has added new panic hardware options to its Vision 7 Thermal Commercial Door – introducing both surface mounted and concealed systems for ease of opening in the event of an emergency.

Posted in Access Control & Door Entry Systems, Aluminium Products, Architectural Ironmongery, Articles, Building Industry News, Building Products & Structures, Building Services, Building Systems, Doors, Facility Management & Building Services, Health & Safety, Innovations & New Products, Restoration & Refurbishment, Retrofit & Renovation, Security and Fire Protection

Geberit
ASSA ABLOY
Mitsubishi Electric

Filton and Bradley Stoke MP visits Mitsubishi Electric installation

Claire Hazelgrove, Member of Parliament for the Filton and Bradley Stoke constituency, visited Brabazon on 7 November to see firsthand the installation of innovative Ecodan heat pumps by Mitsubishi Electric.

Posted in Articles, Building Industry News, Building Products & Structures, Building Services, Case Studies, Facility Management & Building Services, Heating Systems, Controls and Management, Heating, Ventilation and Air Conditioning - HVAC, news, Pipes & Fittings, Plumbing, Retrofit & Renovation, Sustainability & Energy Efficiency