Washroom Washroom

Off-site Washroom Washroom project taking shape

  • 18 Oct 2017

Washroom Washroom has recently completed the construction of a full sized mock-up washroom for a prestigious central London office refurbishment.

As part of the New Bracken House project, the leading washroom designer and manufacturer used the exact materials as specified to build the mock-up to full scale.

Created offsite in Essex, at the company’s factory, the team worked closely with McLaren Construction to ensure all elements of the design were perfect before installation on site begins in the next few weeks.

The new washrooms will soon be installed on eight floors in the North and South cores of the building, featuring Washroom’s popular Alto full height toilet cubicles in high gloss white laminate.

Integrated Concerto duct panels, manufactured in the same high gloss white laminate, will also be installed behind the WCs.

The bespoke Corian trough style vanity units have been designed to deliver a contemporary, high specification feel to complement the rest of the building.

The units also feature Swiss Lamex metallic effect glass splashback panels behind the sinks for a completely bespoke finish, while Washroom’s Tego hinged mirror system above completes the design. Washroom is also set to install all the ancillaries in the washrooms as part of the project.

 

Contact:

Washroom Washroom Ltd.
Units 1-10 Hill Farm
Epping Lane
Abridge
Essex RM4 1TU

Phone: 0800 999 8888

Email: [email protected]

Visit the Washroom Washroom website

Leave a Reply

Latest news

Mitsubishi Electric

Filton and Bradley Stoke MP visits Mitsubishi Electric installation

Claire Hazelgrove, Member of Parliament for the Filton and Bradley Stoke constituency, visited Brabazon on 7 November to see firsthand the installation of innovative Ecodan heat pumps by Mitsubishi Electric.

Posted in Articles, Building Industry News, Building Products & Structures, Building Services, Case Studies, Facility Management & Building Services, Heating Systems, Controls and Management, Heating, Ventilation and Air Conditioning - HVAC, news, Pipes & Fittings, Plumbing, Retrofit & Renovation, Sustainability & Energy Efficiency

Ideal Heating
Ideal Heating
Hambleside Danelaw

Hambleside Danelaw: ThinVerg® Dry Fix Verge

Hambleside Danelaw is proud to bring to market a new and updated Thin Leading Edge Interlocking Dry Fix Verge. Superseding the HD TIDV, the ThinVerg® is a result of ongoing product development based on customer demands.

Posted in Articles, Building Industry News, Building Products & Structures, Building Systems, Innovations & New Products, Posts, Restoration & Refurbishment, Retrofit & Renovation, Roofs